Dear Shareholders,
Your Directors are pleased to present the 23rd Annual Reportand Audited Financial Statements for the Financial Year ended31st March, 2026 together with the reports of StatutoryAuditors. Comments of Comptroller & Auditor General of Indiaare yet to be received by the Company.
1. FINANCIAL PERFORMANCE HIGHLIGHTS
The key highlights of the financial performance ofthe company during F.Y. 2025-26 along with thecorresponding performance in F.Y. 2024-25 are mentionedbelow (rounded to nearest rupees/crore):
Particulars
2025-26
2024-25
%
Increase/
Decrease
Turnover
20,012.26
19,869.35
0.72%
Total Income
20,818.75
20,888.24
-0.33%
Operating Income
1,190.60
1,470.29
-19.02%
Reserves & Surplus
6,777.80
6,538.70
3.66%
Profit Before Tax
1,102.27
1,550.18
-28.89%
Profit After Tax
800.48
1,188.62
-32.66%
Net worth
8862.824
8,623.72
2.77%
Appropriations
Final Dividend
148.04*
358.62
Interim Dividend
208.50
* Final dividend amounting to D148.04 crore @ D0.71 per fullypaid equity share recommended by the Board of Directorssubject to the approval of shareholders in the ensuing AnnualGeneral Meeting of the Company.
Capital Structure
With an Authorized share capital of the Company ofD3000 crores, there has been no change in the CapitalStructure of the Company, with the Paid-up share capitalof the Company remaining at D2085.02 crore. TheCompany has not issued any share during the year underconsideration.
Your Company has not provided any Employee StockOption Plan (ESOP); therefore, disclosure requirement inrelation to ESOP under Rule 12(9) and Rule 16(4) of theCompanies (Share Capital and Debentures) Rules, 2014 isnot applicable.
As on 31.03.2026, the present Shareholding of Presidentof India (POI) is 1,51,87,43,694 equity shares of C10 eachamounting to D 15,18,74,36,940 i.e. 72.84%.
Profit before Tax decreased from D1,550.18 crore in
2025- 26 showing a decrease of 32.66%.
The Net Worth of your Company has increased over theprevious year from D8,623.73 crore to D8,862.82 crore on
account of transfer of profits (after payment of Dividend).
The Reserves & Surplus of the Company for FY 2025-26stand at D6,777.80 crore as compared to D6,538.70crore in FY 2024-25, showing an increase of 3.66% fromprevious year.
The Board recommended a final dividend of D148.04crores (C0.71 per share) subject to the approval ofshareholders in the ensuing Annual General Meeting ofthe Company. Total dividend for the financial year 2025-26is D356.54 crore.
Your company has not accepted any deposit from thepublic during the year.
RVNL received an amount of D12,509 crores (approx.) forproject expenditure during the current year, from Ministryof Railways (MoR) for execution of various works.
During the year, no borrowing was made from IRFC. Withthis, the total amount received from IRFC is D7865.08crore. The principal and interest on the borrowingsfrom IRFC are repaid by Ministry of Railways (MoR) as apass-through entry in the books of RVNL. During theyear, an amount of D499.51 crore towards principal& D570.15 crore towards interest was paid to IRFC onthis account, leaving an outstanding loan& Principalbalance of D5278.07 crore (including interest accrued ofD1285.22 Cr).
Your Company has achieved a turnover of D20,012.26crore in 2025-26 as compared to D 19,869.35 crorein 2024-25.
At the same time, there has also been a significantincrease in the revenue from the projects secured through
bidding to the tune of D6283.04 crore during 2025-26 incomparison to D2771.50 crore in the previous year.
The consolidated Financial Statements of the Companyprepared in accordance with the provisions of CompaniesAct, 2013 and the applicable Indian Accounting Standards(IND-AS) for the financial year 2025-26 forms part of theAnnual Report of the Company. The accounts have beenconsolidated with SPVs, JVs, Associates and its whollyowned subsidiaries. The related entries appearing inthe standalone accounts of RVNL have been adjustedaccordingly in consonance with the relevant IndianAccounting Standards (Ind AS 110& 28). The salientfeatures of differences in the significant entries betweenthe Standalone Accounts of RVNL and the ConsolidatedAccounts are as under:
Particular
Figures as on31.3.2026Standalone
Figures as on31.3.2026Consolidated
20012.26
20412.12
Other Income
806.49
775.23
Direct Expenses
18821.66
19187.18
Indirect Expenses
894.82
912.81
PBT
1102.27
1181.24*
PAT
870.66
Reserve & Surplus
6777.80
7733.08
Net Worth
8862.82
9818.10
* PBT includes C93.88 crore as proportionate share of RVNL in theprofit/loss of Joint Ventures.
During the financial year under review, the Companyhas incorporated a wholly-owned subsidiary namelySabbavaram Sheelanagar Road Development Limited.
The performance and financial position of the subsidiarycompanies, associates and joint venture is provided in theconsolidated financial statement.
The Policy for determining material subsidiaryCompanies as approved by the Board may be accessedon the Company's website athttps://rvnl.org/RVNL cms/uploads/copolicv/RVNLMaterialitvPolicies.pdf.
Integral Reports
Name of Report Annexure
Management Discussion and Analysis A
Corporate Governance Report B
Corporate Social Responsibility (CSR) C
Report
Business Responsibility and Sustainability D
Report (BRSR)
Secretarial Auditor Report E
Form AOC-2 F
The Management Discussion and Analysis Reportprovides an overview of the affairs of the Company, itsbusiness environment, mission and objectives, outlook,operational performance, its resources and systems,strengths, opportunities, constraints, risks and concerns,strategies, prospects, etc. (Annexure A).
The Corporate Governance Report highlights theCompany's philosophy on Corporate Governance andKey Values, composition of Board of Directors and itsCommittees, attendance and remuneration of Directorsetc. other relevant disclosures, CEO/CFO Certificationand general information for shareholders. The followingcompliance certificates as required under DPE Guidelinesand SEBI Regulations supplement it. (Annexure B).
• A Certificate signed by the Chairman and ManagingDirector affirming receipt of compliance with theCode of Conduct from all Board members and SeniorManagement personnel during the year 2025-26(placed at Annexure “B-1") as per guidelines ofDepartment of Public Enterprises on CorporateGovernance.
• A Certificate from the Chairman and ManagingDirector (CMD) and Chief Financial Officer (CFO) withregard to the authenticity of financial statements(placed at Annexure “B-2"); and
• A Certificate of compliance on CorporateGovernance signed by a practicing CompanySecretary (placed at Annexure “B-3") as perguidelines of Department of Public Enterprises onCorporate Governance and Listing Regulations.
• Certificate on non-disqualification of Directors asper schedule V of SEBI (LODR) Regulations, 2015(placed at Annexure “B-4")
reflects RVNL's plans, policy, budget, expenditure,evaluation process for projects and CSR activitiesundertaken during the year. (Annexure C)
The “Business Responsibility and Sustainability Report(BRSR)" describes the initiatives taken by the Companyfrom an Environmental, Social and Governance (ESG)perspective in terms of amendment to Regulation 34 (2)(f) of SEBI (LODR) Regulations 2015. (Annexure D)
Pursuant to provisions of Section 204 of Companies Act,2013, Regulation 24A of the SEBI (LODR) Regulationsand Companies (Appointment and Remuneration ofManagerial personnel) Rules 2014, the Company hasappointed M/s. Sinha & Srivastava LLP, A firm ofCompany Secretaries, to undertake the Secretarial Auditof the Company. The Secretarial Audit Report is placed atAnnexure “E".
As per Section 92 (3) of the Companies Act, 2013, AnnualReturn will be available on the website of the Companyi.e., www.rvnl.org.
The disclosure of Related Party Transactions, as requiredunder section 134 (3) (h) of Companies Act, 2013 and Rule8 (2) of the Companies (Accounts) Rules, 2014 in Form"AOC-2" is placed at Annexure "F".
3. Operational Performance
Your Directors are delighted to inform that the F.Y. 2025-26has been a year of operational excellence and growth forthe Company.
In 2025-26, 173.82 km sections were commissionedconsisting of 12.14 km of New Line and 161.68 km ofDoubling handed over to Zonal Railways for operations.
During the year, Phephna-Indara, Mau-Shahganj(excluding Indara-Mau) (150.28 km) doubling project fullycommissioned.
Out of 160 projects completed so far, 158 projects havebeen fully commissioned and handed over to Railways foroperations and maintenance.
Signalling & Telecommunication:
RVNL is a major contributor in providing EI installationson Indian Railways in connection with Doubling, 3rd Line,New Line and Gauge Conversion. Keeping its traditionhigh, during FY 2025-26, RVNL has commissioned NewElectronic Interlocking and alteration in existing ElectronicInterlocking at 48 Stations on Indian Railways.
RVNL has also commissioned 7 nos. Major Yard remodelingwork on Indian Railways viz. Jakhapura, Milavittan,Manoharpur, Tenali, Sambalpur, Mathura and Dhuristations with routes varying from 200 to 600+ Routes.
Railway Electrification:
During the year, Railway Electrification of 173.82 km wascommissioned as part of Doubling.
3.1 Physical Size of the Projects:
Since its establishment in 2003, Ministry of Railways hastransferred 185 projects to RVNL for execution, which maybe broadly classified under the following heads:
• Doubling 69
• Gauge Conversion 12
• New Lines 13
• MTP 06
• Railway Electrification 39
• Workshops 21
• Others 25
And after implementation of revocation of policy forassignment of work to PSUs in 2021, RVNL had participatedin Open Bidding and projects awarded through biddingsand taken Nomination work other then Railways as onMarch 2026 are:
• Awarded through Bidding 104
• Nomination work other then Railway Projects 10
The distribution of project length under various planheads of Railway works is shown below:
3.1.1 Nature of Works being Executed by RVNL:
RVNL is executing all types of Railway Infrastructureworks such as New Line, Gauge Conversion, Doubling/3rdLine/4th Line, Railway Electrification, Workshops, HillRailway Projects, Institutional & Residential Buildings,Mega Bridges, Metro Railway, Port, Tunnels, MonumentalBridges, Canals, Transmission Lines, Highways, SignallingWork, MMLPs etc.
3.1.2 Project Implementation Units (PIUs):
These projects are spread all over the country andfor efficient implementation of projects, 27 ProjectImplementation Units (PIUs) established at 23 locationsto execute projects in their geographical hinterland. Theyare located at Ahmedabad, Agra, Bengaluru, Bhopal,Bhubaneshwar, Chennai (2 Units), Chandigarh, Indore,Kolkata (3 Units), Kharagpur, Lucknow, Mumbai, Nagpur,Patna, Pune, Raipur, Rishikesh, Ranchi, Secunderabad,Varanasi (2 Units), Delhi, Bharatnet (East-Lucknow, West-
Noida) and Waltair. The PIUs are established and closed asper requirement.
The Company has foreign presence in Maldives, AbuDhabi, Dubai, Saudi Arabia, South Africa, Uzbekistan,Oman, Rwanda and Kyrgyzstan.
3.2 Status of physical progress of projects
The status of the 299 projects is as under: -
Projects commissioned up to March 2026
158 No.
•
Doubling
63 No.
Gauge Conversion
11 No.
New Lines
07 No.
MTP
02 No.
Railway Electrification
38 No.
Workshops
19 No.
Others
20 No.
Projects under implementation
141 No.
MoR :
27 No
Bidding Works :
104 No.
Nomination works other than Railways :
10 No.
RVNL has so far completed 160 projects.
The list of 160 projects fully completed up to March 2026 is as under:
S.
No.
Railway
Project Name
Type of Project
Length (km)
1.
Central Railway
Diva - Kalyan 5th & 6th Line
11
2.
Pakni - Mohol Doubling
17
3.
Panvel - Jasai JNPT Doubling
28.5
4.
Pakni - Solapur Doubling
16.28
5.
Central Railway & SCR
Daund- Gulbarga- Doubling (224.9 km) and Pune-Guntakal -Electrification (641.37 km)
224.9
6.
Eastern Railway
Gurup - Saktigarh Extn of 3,d Line
26
7.
East Central Railway
Barauni - Tilrath Bypass Doubling
8.3
8.
East Coast Railway
Talcher-Cuttack-Paradeep Doubling with 2nd Bridgeon Rivers Birupa & Mahanadi
3
9.
Jakhapura- Haridaspur 3'd Line
23.3
10.
Cuttack - Barang Doubling
14.3
11.
Rajatgarh-Barang Doubling
31.3
12.
Khurda-Barang - 3rd line (35 km)
32.32
13.
Sambalpur-Titlagarh (182 km)
182.00
14.
Raipur-Titlagarh (203 km)
203
15.
Banspani-Daitari-Tomka-Jakhapura (180 km)
180
16.
Northern Railway
New Delhi-Tilak Bridge- 5th & 6th line (2.65 km)
2.65
17.
Utraitia-Raebareli (65.6 km)
68.04
18.
Raebareli-Amethi (60.1 km)
59.00
19.
Rajpura-Bhatinda Doubling with Electrification(172.64 km)
172.64
20.
Janghai- Phahamau DL
49.16
21.
North Central Railway
Palwal - Bhuteswar 3rd Line
81
22.
Aligarh - Ghaziabad 3rd Line
106.1
23.
Bhimsen-Jhansi (206 km) with RE
206
24.
North Eastern Railway
Varanasi- Madhosingh- Allahabad
120.35
25.
Phephna-Indara, Mau-Shahganj (excluding Indara-Mau) (150.28 km)
150.28
26.
North Western Railway
Bhagat Ki Kothi - Luni Doubling
30.3
27.
Karjoda - Palanpur Doubling
5.4
28.
Rewari- Manheru Doubling
69.02
29.
Rani-Keshav Ganj Doubling
59.5
30.
Abu Road-Sarotra Road- Patch doubling (23.12 km)
23.12
31.
Swaruganj-Abu Road - Patch doubling (25.36 km)
25.36
32.
Sarotra Road-Karjoda - Patch doubling (23.59 km)
23.59
33.
Southern Railway
Attipattu - Korukkupet 3,d Line
18
34.
Pattabiram - Tiruvallur 4th Line & Tiruvallur -Arakkonam 3rd Line
41.89
35.
Tiruvallur - Arakkonam 4th Line
28
36.
Villipuram-Dindigul Doubling
273
37.
Thanjavur-Ponmalai - Doubling
46.96
38.
Madurai-Maniyachi-Tuticorin (160 km)
160
39.
Maniyachi-Nagercoil DL
102
40.
South Central Railway
Pullampet - Balapalle Ph I of Gooty - ReniguntaDoubling
41
41.
Krishnapatnam - Venkatachalam Doubling with RE
16.5
42.
Gooty - Renigunta Patch Doubling
151
43.
Raichur - Guntakal Doubling
81.0
44.
Guntur-Tenali - Doubling with electrification (24.38km)
25
45.
Vijaywada-Gudivada- Bhimavaram-Narasapur,Gudivada-Machlipatnam and Bhimavaram-Nidadavolu (221 km) - Doubling with electrification
221.00
46.
Secunderabad (Falaknuma)-Mehbubnagar doubling
85.70
47.
Vijaywada - Gudur 3rd Line Project
287.67
48.
South Eastern Railway
Tikiapara - Santragachi Doubling
5.6
49.
Panskura - Kharagpur 3'd Line
45
50.
Panskura - Haldia Ph 1 Doubling
14
51.
Rajgoda - Tamluk (Jn. Cabin) Doubling
13.5
52.
Tamluk Jn. Cabin - Basulya Sutahata Doubling
24.23
53.
Goelkera-Monoharpur 3rd line (40 km)
27.5
54.
South East CentralRailway
Bilaspur - Urkura 3rd Line Doubling
105
55.
Salka Road- Khongsara Patch Doubling
56.
Khodri-Anuppur, with Flyover at Bilaspur (61.6 km)
61.6
57.
South Western Railway
Hospet - Guntakal Doubling
115
58.
West Central Railway
Bhopal-Bina - 3rd line (143 km)
144.3
59.
Itarsi-Budni - 3rd line (25.090 km)
25.09
60.
Barkhera-Habibganj - 3rd line (41.420 km)
41.2
61.
Bina-Kota (282.66 km) with RE
282.66
62.
Barkhera - Budni 3rd line
26.5
63.
Western Railway
Palanpur- Samakhiali (247.73 km)
247.3
64.
Lucknow-Pilibhit via Sitapur, Lakhimpur (262.76 km)
GC
262.76
65.
Delhi - Rewari Gauge Conversion
94.2
66.
Ajmer - Phulera - Ringus - Rewari Gauge Conversion
295
67.
Bhildi - Samdari Gauge Conversion
223
68.
Thanjavur - Villupuram Gauge Conversion
192
69.
Cuddalore - Salem Gauge Conversion
193
70.
Arasikere-Hassan-Mangalore Gauge Conversion
230
71.
Bharuch - Samni - Dahej Gauge Conversion
62
72.
Gandhidham - Palanpur Gauge Conversion
301
73.
Ahmedabad-Botad (170.48 km)
166.09
74.
Dhasa-Jetalsar (104.44 km)
106.69
75.
Daitari - Banspani New Line
New Line
155
76.
Haridaspur-Paradeep (82 km)
82
77.
Angul- Sukinda Road (98.7 km)
95
78.
Mau-Gazipur-Tarighat New Line
16.79
79.
Vallarpadam - Idapally New Line
9
80.
Obulavaripalle- Krishnapattnam (113 km)
121
81.
Tomka -Banspani - RE
RE
144
82.
Kharagpur (Nimpura) - Bhubaneswar IncludingBranch Line of Talcher - Cuttack - Paradeep
581
83.
Bhubaneswar - Kottavalasa
417
84.
Daund-Manmad Incl. Puntamba- Shirdi - RE
255
85.
Reningunta - Guntakal RE
308
86.
Yelahanka - Dharmavaram - Gooty RE
306
87.
Bharuch - Samni - Dahej RE
64
88.
Manheru- Hissar RE
74
89.
Jakhal - Hisar (79 km)
80.0
90.
Chhapra-Ballia-Ghazipur-Varanasi-Allahabad RE(330 km)
330
91.
Guntakal-Kalluru RE (40 km)
40
92.
Utretia - Rae Bareli - Amethi - Janghai RE (214 km)
214
93.
Daund-Baramati (44 km)
44
94.
Amla-Chhindwara-Kalumna
257
95.
Raipur-Titlagarh (203 km) {Part of Vizianagaram -Rayagada - Titlagarh - Raipur (465 km)}
96.
Rajpura - Dhuri - Lehra Mohabat (151 km)
97.
Guntakal - Bellary - Hospet incl. Tornagallu -Ranjitpura Branch Line (138 km)
138
98.
Wani- Pimpalkutti RE (66 km)
66
99.
Manoharabad- Medchal (14 km)
100.
Yalahanka-Penukonda (120.55 km)-Doubling
-
101.
Jakhal - Dhuri - Ludhiana (123 km)
123
102.
Guna-Gwalior (227 km)
227
103.
Rani-Palanpur 166 km
166
104.
Villupuram-Cuddalore Port-Mayiladuturai-Thanjavur& Mayiladuturai-Thiruvarur (228 km)
228
105.
Raebareli-Unchahar incl. Dalmau-Daryapur (63 km)
63
106.
Raninagar Jalpaigudi-New Bongaigaon - Guwahati(Incl) RE (382 km) (Part of Barauni - Katihar -Guwahati Incl. Katihar - Barsoi (836 km) RE
374.98
107.
Chikjajur-Bellary RE (184 km)
183.15
108.
Bengaluru-Omalur Via Hosur RE (196 km)
196.00
109.
Utratia-Raebareli-Amethi 2nd line RE (126 km)
126.00
110.
RE of Sambalpur-Titlagarh Doubling project (96.596km)
96.60
111.
Palanpur-Samakhiali (247.73 km) RE
247.73
112.
Kasganj-Bareilly-Bhojipura-Daliganj RE (401 km)
401
113.
RE of Dhasa - Jetalsar (104.44 km)
104.44
114.
RE of Ahmedabad- Botad (170.48 km)
170.48
115.
Deposit
RE of NTPC siding at Hotgi Station (37 km)
34.41
116.
Electrification of IOCL Siding at Pakni (4 km)
4.15
117.
Electrification of Ultra Tech Cement Siding at Hotgi(8km)
9.75
118.
Electrification of Chettinad Cement Siding at Tilati(7.1km)
5.9
119.
Latur- Setting up of coach manufacturing factory
WKSP
120.
Civil Engineering Works in Connection with DieselLoco Component Factory, Dankuni
121.
Dankuni - Setting Up of Electric Loco Assembly andAncillary Unit of CLW
122.
Ranaghat (EMU Car Shed)-Inspection bay for 15coach maintenance facilities
123.
Jheel Siding Coaching Depot- Infrastructuredevelopment
124.
Barauni - 250 High Horse Power Loco Shed
125.
Gaya -Setting up New MEMU car shed formaintaining 30 rakes of 16 coaches
126.
Vadlapudi- Wagon PoH Workshop of 200 NosCapacity Near Duvvada Station
127.
Khurda Road - Construction of main line electricalmultiple unit car shed (Phase-2)
128.
Kanpur - Construction of MEMU Car shed
129.
Jhansi-Setting up of coach periodic overhauling andrefurbishment workshop
130.
Saidpur Bhitri- Setting up of Electric Loco Shed tohome 200 Locos
131.
Dullahapur Yard - Provision of tower wagonperiodic overhauling shed
132.
Sonipat-Setting up of coach periodical overhaulingand refurbishment workshop
133.
Setting Up of Diesel Multiple Unit (DMU)Manufacturing Factory at Sankrail / Haldia
134.
DLW
Varanasi - Augmentation of Production Capacityfrom 200 To 250 High HP Locos Per Year
135.
Aunrihar - DEMU Shed
136.
Workshop for Manufacture of Flat Bogies for LHBDesign Coaches, Yadgir
137.
Vadodara - Setting up of New PoH Shop forElectrical Locos
138.
Hyderabad-Secunderabad - Multi modal transportsystem (Phase-II)-MTP
78
139.
METKOL
MM of Existing Corridor Noparanagar-Baranagar-Daksineshwar
4.14
140.
Barddhaman Yard - 4-lane road over bridge in lieuof 2-lane road over bridge No. 213
ROB
141.
Srirangam-Tiruchchirapalli Town - 4-lane road overbridge in lieu of 2- lane bridge No.380-A
142.
IOC Siding at Salawas (Deposit Work)
2.82
143.
Secunderabad- Upgradation of facilities atCentralised Training Academy for Railway Accounts
TRG
144.
Moula Ali - Setting Up of Indian Railway Institute ofFinance Management
145.
Lallaguda (Carriage Workshop)- Replacement of100-Year-Old Administrative Building
OSW
146.
New Station Building at Belguam
147.
Second Entry Station Building at Belguam
148.
Proposed Coaching Depot at Belgaum
149.
Yard Remodelling Works at Belgaum
150.
Madar - Palanpur - Removing of PSR (Kms 589/1 to590/1)
Track Renewal
151.
Jhansi-Garhmau, Orai-Ata, Ata-Kalpi & Pokhrayan-Lalpur - Splitting of longer block sections
TF
152.
Paman-Bhimsen - New B-class station
153.
Umdanagar-Timmapur - New crossing station
TFC
154.
Sabarmati-Botad-subways in lieu of levelcrossing-23 Nos.
RSW
155.
Sabarmati-Botad-Subways in lieu of LCs-14 Nos.
156.
Dhasa-Jetalsar-Subways in lieu of Level Crossing-35Nos.
157.
Final Location Survey for New Line Connectivity toChar Dham (327 km)
FLS
158.
Daraganj- Rebuiding (Bridge No. 111 on Ganga)
BRWG
1.934
159.
Pamban Bridge (Lifting Span Bridge)
3.959
Following projects Completed in 2025-26:
160.
Dallirajhara - Rowghat New Line Project
Cumulatively, RVNL has completed a total of 6567.94km of doubling, 2120.36 km of gauge conversion,655.18 km of new lines, 7743.30 km of pure RailwayElectrification, 4590.53 km RE as part of NL/GC/DLand 84.40 km of Metropolitan Transport Project (MTP).Thus, as on 31.3.2026, 17171.19 km of project lengthof 185 sanctioned projects assigned to RVNL, have beencompleted.
During 2025-26, 110.57 km (31.69 km of New Line,78.88 of Doubling), Railway Electrification of 110.57km was also carried out in other than specific RailwayElectrification projects as part of Doubling.
3.4.1 Sections completed under New Line Plan Head: Duringthe year, 31.69 km of New Line was completed, the detailsare given below:
3.4.1.1 Bhanupalli - Bilaspur - Beri (63.1 km) : During theyear, Bhanupalli - Thaluah Yard (7.15 km) section wascompleted in November 2025.
3.4.1.2 Angul - Sukinda (106.69 km): During the year, TalcherRoad - Kamalanga (Route-E) (7.04 km) section wascompleted in January 2026.
3.4.1.3 Dallirajhara - Rowghat (95 km): During the year,Taroki - Rowghat (17.5 km) section was completed inMarch 2026.
3.4.2 Sections completed under Doubling Plan Head: Duringthe year, 78.88 km of Doubling was completed, the detailsare given below:
3.4.2.1 Vizianagaram - Sambalpur (Titlagarh) 3rd Line(263.64 km): During the year, 54.27 km of project lengthwas completed. Komatpalli (KMX) - Donkinavalasa (DNV)(9.82 km) was completed in May 2025, Gajapatinagaram(GPI) - Komatpalli (KMX) (9.57 km) was completed in June2025, Theruvali Jn. (THV) - Bissamcuttack (BMCK) (18.5)was completed in September 2025, Garudaballi (GRBL)- Gajapatinagaram (GPI) (10.51 km) was completed inOctober 2025 and Gotlam (GTLM) - Garudaballi (GRBL)(5.87 km) was completed in December 2025.
3.4.2.2 Bhatni- Aunrihar (118 km): During the year, 20.35 kmof project length was completed. Mau - Pipridih (10.86km) was completed in June 2025 and Salempur - LarRoad (9.49 km) was completed in August 2025.
3.4.2.3 Hospet - Hubli - Tinaighat (335.08 km): During theyear, Cansaulim - Sankaval (4.26 km) was completed inMarch 2026.
Out of 160 projects completed so far, 158 projects have been
fully commissioned and handed over to Railways for operations
and maintenance.
The list of 158 projects commissioned till March 2026 is as under:
Gurup - Saktigarh Extn of 3rd Line
Talcher-Cuttack-Paradeep Doubling with 2nd Bridge onRivers Birupa & Mahanadi
Jakhapura- Haridaspur 3rd Line
Rajatgarh-Barang - 3rd line
Khurda - Barang 3rd Line
Aligarh - Ghaziabad 3,d Line
Bhimsen- Jhansi (206 km) with RE
Abu Road - Sarotra Road Patch Doubling
23.55
Abu Road - Swaroopganj Patch Doubling
New Delhi - Tilak Bridge 5th & 6th Line Doubling
Utretia-Rae Bareli (65.6 km)
Raebareli - Amethi (60.1 km)
Rajpura- Bhatinda (172.64 km)
173.38
Attipattu - Korukkupet 3rd Line
Pattabiram - Tiruvallur 4th Line & Tiruvallur - Arakkonam3rd Line
Pullampet - Balapalle Ph I of Gooty - Renigunta Doubling
Krishnapatnam - Venkatachalam Doubling With RE
Guntur-Tenali - Doubling with electrification (24.38 km)
Secunderabad-Mehboobnagar (85.24 km)
Vijaywada-Gudivada- Bhimavaram-Narasapur, Gudivada-Machlipatnam and Bhimavaram-Nidadavolu (221 km)
- Doubling with electrification
Panskura - Kharagpur 3rd Line
Khodri-Anuppur, with flyover at Bilaspur (61.6 km)
Budni - Itarsi 3'd Line
Barkhera- Habibganj - 3rd line (41.420 km)
143
Bina -Kota (282.66 km) with RE
Ahmedabad- Botad (170.48 km)
Dhasa- Jetalsar (104.44 km)
NL
Angul-Sukinda Road (98.7 km)
98.7
Obulavaripalle - Krishnapatnam New Line
Kharagpur (Nimpura) - Bhubaneswar Including BranchLine of Talcher - Cuttack - Paradeep
Manheru- Hisar (74 km)
74.0
Chhapra-Ballia-Ghazipur-Varanasi-Allahabad (330 km)
Guntakal-Kalluru (40 km)
Daund- Bramati (44 km)
Titlagarh (Excl)-Raipur -RE
Utretia- Rae Bareli- Amethi- Janghai RE
Hospet - Guntakal And Tomagallu - Ranjitpura
Wani-Pimpalkutti (66 km)
Amla - Chhindwara - Kalumna (257 km)
Villupuram-Cuddalore Port-Mayiladuturai-Thanjavur &Mayiladuturai-Thiruvarur (228 km)
Raninagar Jalpaigudi-New Bongaigaon (incl.)-Guwahati(incl.)-382 rkm {Part of Barauni-Katihar-Guwahati inclKatihar-Barsoi (836 km)}
Chikjajur-Bellary (184 rkm)
Bengaluru-Omalur via Hosur (196 rkm)
2nd Line Utratia-Raebareli-Amethi (126 rkm) (NorthernRailway) (PB#135/2018-19/CORE)
RE of Sambalpur-Titlagarh Doubling project (96.596 km)
Palanpur- Samakhiali (247.73 km) RE
Civil Engineering Works in Connection with Diesel LocoComponent Factory, Dankuni
Ranaghat (EMU Car Shed)-Inspection bay for 15 coachmaintenance facilities
Gaya -Setting up New MEMU car shed for maintaining 30rakes of 16 coaches
Vadlapudi - Wagon PoH Workshop of 200 Nos CapacityNear Duvvada Station
\
Sonipat-Setting up of coach periodical overhauling andrefurbishment workshop
Workshop for Manufacture of Flat Bogies for LHB DesignCoaches, Yadgir
Setting Up of Diesel Multiple Unit (DMU) ManufacturingFactory at Sankrail / Haldia
Varanasi - Augmentation of Production Capacity from200 to 250 High HP Locos Per Year
Saidpur Bhitri- Setting up of electric loco shed to home200 locos
Dullahapur Yard - Provision of tower wagon periodicoverhauling shed
Vadodara - Setting up of New PoH Shop for ElectricalLocos
Hyderabad-Secunderabad - Multi modal transport system(Phase-II)-MTP
Barddhaman Yard - 4-lane road over bridge in lieu of2-lane road over bridge No. 213
Electrification of IOC Siding at Salawas (Deposit Work)
Electrification of Ultra Tech Cement Siding at Hotgi (8km)
Secunderabad- Upgradation of facilities at CentralisedTraining Academy for Railway Accounts
Madar - Palanpur - Removing of PSR (Kms 589/1 to 590/1)
TR
Jhansi-Garhmau, Orai-Ata, Ata-Kalpi & Pokhrayan-Lalpur -Splitting of longer block sections
Umdanagar- Timmapur - New Crossing Station
Sabarmati-Botad-subways in lieu of level crossing-23 Nos.
Dhasa-Jetalsar-Subways in lieu of Level Crossing-35 Nos.
Final Location Survey for New Line Connectivity to CharDham (327 km)
Project commissioned in 2025-26 is as under:
Phephna-Indara, Mau-Shahganj (excluding Indara-Mau)(150.28 km)
3.5 Sections of Projects Commissioned and handed over to Railways in 2025-26:
3.5.1 In 2025-26, 173.82 km sections were commissioned consisting of 12.14 km of New Line and 161.68 km of Doubling handedover to Zonal Railways for operations. Railway Electrification of 173.82 km was also carried out in other than specific RailwayElectrification projects as part of Doubling, the details are given below:
SN
Plan
Head
Name of work
Section Targeted
Section
Length
(km)
Total Length
Zonal
1
Angul - Sukinda
Talcher Road-Kamalanga (Route-E)
7.042
ECoR
2
Neora- Daniawan &Barbigha & sheikpura
Barbigha- Sarsajamalpur
5.1
ECR
Total New Line:
12.14
DL
Vizianagaram-Titlagarh 3rd line
Parvatipuram-Sitanagaram-Bobbili-
Donkinavalasa
36.05
43.23
Project
Ladda-Jimidipeta
7.18
4
Vijayawada-Gudur 3rd
Singarayakonda - Surareddipalem
17.8
50.05
SCR
Line with RE Project
Tsunduru-Tenali-Duggirala-
Pedavadlapudi
32.25
5
Bhatani - Aunrihar
Mau-Pipridih-Dullahpur
18.28
32.81
NER
Peokol-Salempur-Lar Road
14.53
6
Phephna-Indara, Mau-Shahganj (excludingIndara-Mau)
Mau-Khurahat
12.53
7
Sonnagar - Patratu 3
Bendi-Kumandi
6.74
18.51
rd Line
Muhammad Ganj-Satbahini-UntariRoad
11.77
8
Kharagpur-Adityapur3rd line project
Salgajahri East- Salgajhari West(West End of LC 139)
3.05
SER
RPJ-BTI Doubling
DUI yard remodelling
1.5
NR
Total Doubling:
161.68
G. Total
173.82
3.6 Signalling and Telecommunication:
The Signaling & Telecommunication (S&T) domain providesappropriate and cost-effective solutions for efficient andsafe operation of trains on Indian Railways. RVNL promotesuse of modern technologies on Indian Railways namelyElectronic Interlocking (EI), Digital Axle Counters, FiberOptic Cable Network, Automatic Block Signaling, ETCSL1/L2/L3, IOT based Diagnostic & Predictive Maintenancesystems etc.
The technological advancement is aimed to achieve highlevel of safety in train operations, availability of systemand increased speeds of trains with minimum headways. This ensures the efficient punctual operation ofFreight as well as of Coaching Trains. This has resulted inreduction of turnaround in freight transportation. Withcontinuous and tireless effort of S&T vertical of RVNL inRailway Infrastructure, Indian Railways is able to achieveincrease in freight loading and operation of large numberof passenger trains across the length and breadth ofthe country.
RVNL has taken up 55 Nos. of Non-Interlocking (NIs) ofstations for commissioning of Doubling, 3rd Line and NewLine projects during the year. RVNL has also commissioned
the 19 numbers of IBS, 379 Automatic Signalling usingElectronic Interlocking and 29 Nos of mid-section levelcrossing gates have been interlocked with signals toimprove safety of road user. Not only on the Signallingfront, RVNL has also completed the incredible achievementin the area of telecommunication by providing 2195.7 kmof Fiber Optic Network and 6 Quad Cable network in IRand and 5700 Km of Fiber Optic Network Cable networkin BSNL (as part of Bharatnet Project UP East & UP West)during the year.
RVNL equiped with a strong team of IRSTELO licenseholders who are experienced to approve Logic & InterfaceCircuits and design drawings of all types of Railwaysignaling systems in-house. So far, RVNL has checkedInterface Circuits of 16 stations and Logic Circuits of 6stations of ECR and NCR. Moreover, RVNL Design team haschecked Axle Counter Circuit of 1 no. station viz. BENDI inECR. This has reduced significantly the workload of ZonalRailways Design team and expedited the approval processof Logic & Interface Circuits. This has resulted in timelycommissioning of large number of stations by RVNL toadhere the target set by Railway Board.
RVNL has participated in various tenders of AutomaticSignalling, Replacement of Panel Interlocking with EI,Vedio Survelliance System and KAVACH of Zonal Railwaysand has been awarded works of C531 crore of South EastCentral Railway , South Western Railway and SouthernRailway during FY 2025-26.
Having played a very vital role in providing large nos.of signaling installations in connection with largeinfrastructure projects on Indian Railway, Signaling& Telecommunication vertical is on the lookout foropportunities in various signalling and telecom sector ofRailways & other industries within India & abroad.
3.7 Projects under implementation:
There are 141 projects under various stages of implementation by RVNL.
3.7.1 The details of 27 projects assigned by Ministry of Railways to RVNL till March 2026 and which are under implementationare as under:
Name of Project
Plan Head
Dhanbad-Sonnagar (Patratu-Sonnagar) - 3rd line (291 km)
Vizianagaram-Sambhalpur (Titlagarh) 3rd line
NCR
Mathura-Jhansi 3rd line
Bhatni - Aunrihar with electrification (125 km) (excl Indara - Mau (116.95 km))
Vijayawada-Gudur 3rd line
Kharagpur (Nimpura)-Adityapur 3,d line (132 km)
SWR
Hospet-Hubli-Londa-Tinaighat-Vasco da Gama (352.28 km)
WR
Junagarh - Visavadar (42.28) km
Gauge
Conversion
CR
Yevatmal- Nanded (206 km) NL
Fatuah-Islampur incl. material modification for extension of new line from Neora toDaniawan; Daniawan to Biharsharif; Biharsharif to Barbigha; Barbigha to Sheikhpura
Rishikesh-Karnaprayag (125.09 km)
Bhanupalli-Bilaspur-Beri (63.1 km)
SECR
Dallirajhara-Rowghat (90 km) {Part of Dallirajhara-Jagdalpur (235 km)}
WCR
Indore-Jabalpur (342 km) NL sanctioned as Budhni-Indore (205 km)
ER
Nabadwipghat-Nabadwipdham upto BB loop (9.58 km) {Part of Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur Nabadwipghat- GC, Krishnanagar-Chartala, MM for Krishnanagar Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgola strengthening (bridge No.2)}
CORE
Hospet - Hubli - Vasco da Gama (346 km)
Kazipet - Workshop for Wagon Periodical Overhauling
SR
Repair of S&T Workshop at Podanur, Tamil Nadu
Samudragarh - Nabadwipdham - Road over bridge in lieu of level crossing No.14
National Rail & Transportation Institute at Vadodara (NAIR)
Construction of hostels in centralised training institutes (Umbrella Work 2019-20)
Infrastructure up-gradation of Training Institutes at NAIR Campus
Direct Power Supply from Central Generating Agencies
OEW
Ghatkesar-Raigir (Yadadri)-Extension of multi modal transportation system Phase-II
METRO
Baranagar-Barrackpore & Dakshineswar - Construction of Metro Railway (14.5 km)
Dum Dum Airport-New Garia via Rajerhat - Construction of Metro Railway (32 km)including Naupara (Ex.)-Baranagar (2.6 km) {Part of Dumdum-Baranagar Metro Railwaysanctioned as MM to Dumdum-New Garia Metro Railway vide letter No. 96/Proj/C/5/1/Pt. Dated 30.10.09}
Joka-Binoy Badal Dinesh Bagh via Majerhat - Construction of Metro railway (16.72 km)incl material modification for extension from Joka Diamond Park (Phase-I)
3.7.2 The list of 104 projects awarded to RVNL through Competitive Bidding and under execution is as under:
3.7.2.1 The details of 91 projects awarded to RVNL through competitive biddings up to March 2025 are as under:
Agency/Client
MP Metro
Design and Construction of Elevated 10 km Viaduct and 09 Elevated Metro Stationsincluding all Civil, Structural, Roof structure, MEP works, Architectural finishes, Fagade,etc for Indore Metro Rail Project.
Metro Works
Design and Construction of 07 Elevated Metro Stations including Structures,Architectural Finishes, E&M Works etc. of Indore Metro Rail Project.
NHIDCL
DPR Preparation for Highways in North-East Region in state of Nagaland for length of200 KM.
DDC
DPR Preparation for Highways in North-East Region in state of Nagaland for length of280 KM.
DPR Preparation for Highways in North-East Region in state of Mizoram for length of740 KM.
NFR
Construction of Single BG Tunnel Line No. 06 (approx. length 4930m) between Ch.45800 to Ch. 50730 including Escape Tunnel (Total length 4600m), in connection withDMV-Kohima new BG Line Project
Civil
GMRCL
Supply Installation Testing and Commissioning of Ballastless track (L -55 TKM) fromSarthana to Dream city in elevated and underground section for corriodr -1, SuratMetro, Phase -II
NHAI
Construction Of 4 Laning of Nh-5 From Kaithlighat To Shakral Village (Shimla BypassPackage 1: From Km 128.835 To Km 146.300 For Design Length=17.465km) In HimachalPradesh On Hybrid Annuity Mode.
Construction of 4 lane highway from Samarlakota to Achampeta Junction (from km.0.000 to Km. 12.250) as a part of Kakinada port to NH-16 connectivity in the State ofAndhra Pradesh under Bharatmala Pariyojana on EPC mode.
AMC
Development of Kharicut Canal (Between Naroda Smashan Gruh & Vinzol Vehla) inAMC area Pakage-2: Kharicut Canal Development Navyug School Canal Crossing toNidhipark Society (Ch. 2500 - Ch. 5000)
Development of Kharicut Canal (Between Naroda Smashan Gruh & Vinzol Vehla) inAMC area Pakage-3: Kharicut Canal Development Nidhipark Society to Odhav FireStation (Ch. 5000 - Ch. 7600)
GoG-NHDivision
Up gradation to Six Lane with Paved Shoulder of Sarkhej-Changodar Section of NH 8A(New NH 47) from KM 11+950 to KM 16+000 on EPC mode in the State of Gujarat
CMRCL
Construction of Elevated Viaduct (approximate length of 10 km), nine (9) ElevatedMetro Stations at Sholinganallur Lake-I, Sri Ponniamman Temple Sholinganallur Lake-II, Sathyabama University Semmeancheri-I, Semmeancheri-II, Gandhi Nagar, Navallur,Siruseri, Siruseri Sipcot-1 And Siruseri SIPCOT-2 and stabling viaduct at SIPCOT
Construction of Bhesan Depot Cum Workshop Which Includes DCC, BCC and AssociatedE&M Works Under Corridor - C2, Bhesan To Saroli, For Surat Metro Rail Project Phase- 1, DC-2
Design, Supply, Erection, Testing and Commissioning for OHE Modification Work inthe existing 25 kV OHE for increasing speed potential to 160 KMPH under East CentralRailway Pradhankhanta - Bandhua Section of Dhanbad Division (DHN).
Electrical
MEA
Development of the UTF Harbour Project in Maldives
Southern
Provision of Automatic Block Signalling with Dual MSDAC, EI/OC interface and BlockOptimization in Arakkonam Junction(AJJ)-Nagari (NG) Section of Chennai (MAS)Division in Southern Railway (Reach-I).
S&T
Provision of Automatic Block Signaling with Dual MSDAC, EI/OC Interface and BlockOptimization in NAGARI(NG) - TADUKU(TDK) section and Replacement of EI/RRI atVEPAGUNTA (VGA) Station of CHENNAI (MAS) Division in Southern Railway (Reach-II).
Provision of Automatic Block Signaling with Dual MSDAC, EI/OC Interface and BlockOptimization in TADUKU(TDK)-RENIGUNTA (RU) section and Replacement of EI/RRI atTADUKU (TDK), PUDI (PUDI) & SRI VENKATA PERUMAL RAJU PURAM (SVF) Stations ofCHENNAI (MAS) Division in Southern Railway (Reach-III).
MPPKVVCL
Commissioning of 33 KV Line associated works such as 33 KV Line Bifurcation, 33 KVLine Interconnection and 33 KV Line Conductor Augmentation in Rewa, Satna, Sidhi,Singrauli, Sagar, Damoh, Chhatarpur, Panna and Tikamgarh Circles (Package-10) areaof MPPKVVCL, Jabalpur under Revamped - Reforms - Based and Results - LinkedDistribution Sector Scheme
Supply, Erection, Testing and Commissioning of power Supply Receiving & DistributionSystem, 750 V D Third Rail Traction Electrification and Scada system for AhmedabadMetro
NWR
Provision of Automatic Block Signalling on Madar-Sakhun Section (51.13 Kms) of JaipurDivision over North Western Railway.
IR
Manufacturing cum Maintenance of 200 nos. of Vande Bharat Trainsets includingupgradation of the Government Manufacturing Units & Trainsets Depots
Manufacturing
Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited||MPMKVVCL - Civil
Madhya Pradesh Poorva Kshetra: Revamped - Reforms - Based and Results - LinkedDistribution Sector Scheme (RDSS) (Pkg-12)
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Sonepurbighavillage to junction with NH-22 (Chatra Bypass) near Chatra from km 184.700 to km222.000 under Bharatmala Pariyojana in the state of Jharkhand on Hybrid AnnuityMode (Package 8).
Construction of Six Lane Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH-117 in the state of West Bengal on EPC mode
North
Central
Provision of EI based Automatic Signaling with continuous track circuiting and otherassociated works including suitable Indoor alteration in Electronic Interlocking/RRI/PI stations enroute in Jhansi (incl)-Gwalior (Incl.) section of Jhansi Division of NorthCentral Railway.
Supply, Erection, Testing and Commissioning of Power Supply Receiving & DistributionSystem, 750 V Dc Third Rail Traction Electrification And Scada System For Surat MetroRail Project Phase-I
Metro
HORC
C-4: Composite Contract package in connection with New BG Railway Line of HORCproject for: (i) Design & Construction of Twin Tunnel using NATM and Cut & Covermethod from km 24.880 to km 29.580; (ii) Design & Installation of Ballastless Track(excluding supply of rails) from km 24.856 to km 29.680; (iii) Detailed Design, Supply,Installation, Testing & Commissioning of General Electrical Services including Supply,Erection, Testing and Commissioning of 11kV HT/LT Power and Control Cable Network,GIS Substation (11/0.433) kVA, Tunnel lighting system, etc. from km 24.880 to km29.680; (iv) Design & Construction of Embankment, Bridges and other miscellaneousworks from km 12.00 to km 18.00.
MMRDA
Design, Manufacture, Supply, Installation, Testing and Commissioning of 2 nos.110 kV receiving substation including 110 kV, 33kV & 25kV cabling work, complete25kV overhead catenary system alongwith switching station, 33kV auxiliary powerdistribution system including 33/0.415 kV auxiliary sub-station (ASS) and completeSCADA system for main line & depot of Mumbai Metro line 2B of MMRDA. (IFB No:MMRDA/2B/MMRP/CA-40). Design, Manufacture, Supply, Installation, Testing andCommissioning of 2 nos. 110 kV
CMRL
Construction of Five (05) UG Stations at KMC(Kilpauk), Sterling Road, Nungambakkam,Gemini (Anna Flyover), Thousand Lights and Thousand Lights Cross Over Box andworks other than Diaphragm wall of Two UG Stations at Royapettah Chetpet Metro inC3 of CMRL Phase-II Project. UG-03
Construction of Four Underground Stations at Dr. Radhakrishan Salai, Thirumayilai,Mandaiveli and Adyar Junction and Two Cross Passage Shafts and One EmergencyEscape Shaft and works other than Diaphragm wall of One Underground Stations atGreenways Road Metro in Corridor-3 of CMRL Phase-II Project". UG -04
Construction of three (03) Underground Stations at Adyar Depot, Indira Nagar andTaramani Road Junction (Taramani) & Ramp and works other than Diaphragm wallof One Underground Station at Thiruvanmiyur Metro in Corridor-3 of CMRL Phase-IIProject".- UG - 5
WATER
RESOURCES
ZONE,
UDAIPUR
Planning, Design and construction of main Canal and Structures including associateddistribution system to provide Irrigation facility to 41903 ha. area through PipedIrrigation network for Upper High-Level Canal of Mahi Bajaj Sagar Project, Banswara(Raj) on Engineering, Procurement and Construction (E.P.C.) single Responsibilityturnkey basis, including 10 years O&M.
Canal
South
Comprehensive Signalling and Telecommunication Works For Provision Of AutomaticBlock Signalling System In Balharshah - Makudi Section of Secunderabad Division InSouth Central Railway.
Signalling
Supply, Installation, Testing and Commissioning of New 11 KV Lines, LT Line on ABcable, Distribution Transformer Substation and Supporting works such as DPs, TPs,crossing etc. for separation of 11 KV mix Feeders & Mix DTRs under Revamped Reforms-based and Results-linked Distribution Sector (Package-16) in Chhatarpur circle ofMPPKVVCL, Jabalpur Company Area.
Transmission
Line
Supply, Installation, Testing and Commissioning of New 11 KV Lines, LT Line on ABcable, Distribution Transformer Substation and Supporting works such as DPs, TPs,crossing etc. for separation of 11 KV mix Feeders & Mix DTRs under Revamped Reforms-based and Results-linked Distribution Sector (Package-17) in Seoni & Narsinghpurcircle of MPPKVVCL, Jabalpur Company Area.
MMRCL
Design and construction of Elevated metro viaduct of length 6.92 Km between Ch. (-)657.182 m to Ch. (-) 7576.78 m in reach 2A of NMRP phase-2
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole - Paradip Section ofNH-53 (Old NH - 5A) from Km.60.000 to Km.76.646 (Package-4) in the State of Odishaon HAM mode - 2 nd Call
MadhyaGujarat VijCompanyLimited
MADHYA GUJARAT VIJ COMPANY LTD.: Revamped - Reforms - Based and Results -Linked Distribution Sector Scheme (RDSS) (Vadodara)
MADHYA GUJARAT VIJ COMPANY LTD.:Full Turnkey Contract (Design, Supply andInstallation) for Development of Distribution Infrastructure work for Loss reductionat Dist. Dahod under Revamped Reforms- Based and Result-linked Distribution SectorScheme
Construction of A) Six Elevated Metro Station viz. Pili Nadi to Lekha Nagar in Reach-2A,B) One Elevated and one At-Grade station viz. Eco park and Metro City in Reach-1Arespectively. C) At-Grade section Formation earthwork, boundary wall and retainingwall between Ch. 19550 to Ch.20421.016 & Ch. 20498.516 to Ch. 21296.917, D) ElevatedMetro track supporting structure for Ecopark Metro station between Ch.20421.016 toCh. 20498.516 and E) Multi-Storied Building at Tulsi School Land (at Sitabuldi) of NMRPPhase-2
Western
All civil engineering works (Earthwork, Blanketing, Retaining Wall / Boundary Wall/Side Drain, Major Bridges, Minor Bridges and LHS/RUB, LCs, Construction of StationBuildings, Platform, Subways cover over Platforms, Staff Quarters, Passenger Amenities,Circulating Area, approach roads, Offices, Service Buildings, watering, Sanitation,protection works etc. and Supply of 50 mm Machine Crushed Stone Ballast, Completetrack works including linking of Track works in connection with Gauge Conversionwork between Petlad - Bhadran (22.50kms) of Vadodara Division on Western Railway.
Track Work
All civil engineering works (Earthwork, Blanketing, Retaining Wall/ Boundary Wall/Side Drain, Major Bridges, Minor Bridges and LHS/RUB, LCs, Construction of StationBuildings, Platform, Subways cover over Platforms, Staff Quarters, Passenger Amenities,Circulating Area, approach roads, Offices, Service Buildings, watering, Sanitation,protection works etc. and Supply of 50 mm Machine Crushed Stone Ballast, Completetrack works including linking of Track works in connection with Gauge Conversionwork between Nadiad - Petlad (37.26kms) of Vadodara Division on Western Railway.
Construction of 4 nos Tunnels (total Length 1.6km) with ballast less track, Earthworkin formation, Construction of Important Bridges (2nos), Major Bridges (1No), MinorBridges (25nos) , Supply of Stone ballast, Track linking, side drain retaining wall etc.from Km. 831.8 to Km. 841.9 in Dharakoh Maramjhiri section in connection with thirdline.
Tunnels
HPSEBL
Development of Distribution Infrastructure at SOUTH ZONE of Himachal Pradeshunder the Revamped Reforms-based and Results-linked, Distribution Sector Scheme[Loss Reduction Works] NIT/RFB No: CE(MM)/RDSS-(P-03)/SOUTH ZONE
Development of Distribution Infrastructure at NORTH ZONE of Himachal Pradeshunder the Revamped Reforms-based and Results-linked, Distribution Sector Scheme[Loss Reduction Works]
MPMRCL
Part Design and Construction of Elevated Viaduct, Five (5) Elevated Metro Rail Stations(viz. Shaheed Bagh, Khajrana Chauraha, Bengali Chauraha, Patrakar Colony & PalasiaChauraha) and Ramp between Chainages 31+755 to 34+898.061 & 3+669.547 to5+862 for Indore Metro Rail Project (Package IN-04)
Varkala Sivagiri Railway station - Major upgradation / Redevelopement of VarkalaSivagiri Railway station in Kerala
Infrastructure
Supply, Installation, Testing and Commissioning of 11 KV Line associated workssuch as 11 KV Line Bifurcation, 11 KV Line Interconnection, 11 KV Line ConductorAugmentation, LT AB cabling augmentation and conversion of LT Bare conductorto AB cabling under Revamped Reforms-based and Results-linked DistributionSector (Package-11) in Jabalpur (City), Jabalpur(O&M),Katni, Mandla, Dindori, Seoni,Chhindwara, Narsinghpur, Balaghat, Shahdol, Anuppur and Umariya Circles ofMPPKVVCL, Jabalpur Company Area.
Supply, Installation, Testing and Commissioning of New 11 KV line for Bifurcation &Interconnection, Additional 11 KV Bay at 33/11 KV Sub-station, Augmentation ofconductor of 33 KV & 11 KV Lines, Additional Distribution Transformer Substations withassociate New 11 KV Lines, LT Line on AB cable, Conversion of bare LT line with AB Cable,Augmentation of LT AB Cable, Cover conductor for 11 KV Line Crossing Agriculture&Non Agriculture Feeder, 11 kv and 33 kv Bus Bar renovation other associated work,and Supporting works such as DPs, TPs, Crossing etc. in Jhabua O&M Division (LOT-12)under the Revamped Reforms-based and Results-linked, Distribution Sector Scheme
Construction of 220KV & 132KV Transmission Lines and associated Feeder Bays on totalTurnkey basis in Eastern MP
MMRCLPune Metro
Design and Construction of Elevated Viaduct of Length 4.519 Kms from CH:(-)1079.899m to CH: (-)5599.298m between PCMC and NIGDI (Bhakti Shakti) on theNorth-South Corridor of Pune Metro Rail Project- Reach1 - Extension.
RRVPNL
Supply & ETC of 132/33kV Grid Sub-stations alongwith associated Lines & Bays
Signalling and Telecommunication work for provision of Automaticblock signaling on Khapri-Sewagram Section of Nagpur Division.Tender No. 55-2023-GSU-AUTO-KRISEGM
Engineering, Procurement and Construction (EPC) Tender for "Proposed Doublingof Track between Ankai station (Excluding) at Km 16.00 (Ch 16000) & KaranjgaonStation (Excluding) at Km 69.01(Ch 69010) [i.e. (53.01 km)] including Electrification andSignaling works in connection with Aurangabad-Ankai Doubling Project in NandedDivision of South Central Railway".
Redevelopment of Thiruvananthapuram Central Railway Station (JV with KRDCL)
Provision of Automatic Block Signaling system in Jolarpettai Junction to Erode Junctionof Salem Division in Southern Railway.
Eastern
Construction of Sitarampur bye pass line under Asansol Division of Eastern Railway.
South East
Provision of Auto Signalling with Electronic Interlocking (OFC Based) between Champa-Saragaon-Baraduar-Sakti section with alteration in existing Electronic Interlocking &Supply, Installation, Testing, Commissioning of new Electronic Interlocking, MSDAC &IPS etc., execution of all indoor & outdoor works & construction and Electrification ofthe huts etc. in Champa-Sakti Section of Bilaspur Division of S.E.C. Railway.
NMRCL
Construction of 6 Nos Elevated Metro Stations (Cantonment, Kamptee Police Station,Kamptee Municipal Council, Dragon Palace, Golf Club And Kanhan River Metro Station)Between Ch.-7576.78mm To Ch-13457.76m In Reach 2b of NMRP Phase 2
Provision of EI based Automatic Signaling with continuous track circuiting and otherAssociated works along with suitable indoor alterations in Electronic interlocking /RRI/PI stations enroute in Dhaulpur-Gwalior Section of Jhansi division of North CentralRailway
NTPC
PEA contract for execution of Balance Civil & HM works of Barrage Complex includingpart HRT package of Rammam Hydro Electric Project Stage-III (3x40 MW).
Provision of Automatic Signalling on Ernakulam JN(ERS) - Vallattol Nagar (VTK) Sectionon B-Route of Thiruvananthapuram Division in Southern Railway
OHE modification work for Up-gradation of existing 1 x 25 kV Electric Traction Systemto 2 x 25 kV AT Feeding System in Amla-Nagpur Section in Nagpur division of CentralRailway to meet 3000 MT loading target.
Bangalore
Engineering, Supply, Erection, Testing and Commissioning of 33 Kv Distribution,750v Dc Third Rail Traction Electrification Including Traction Substations, AuxiliarySubstations and Scada System for Phase-2a & Phase-2b
East CoastRailway
Provision of Automatic Block Signaling system with dual MSDAC and alterationin existing EI/PI/RRI stations in the section of Jakhapura-Nergundi, Khurda Road-Bhusundpur & Bhusundpur-Golanthra over Khurda Road Division of East Coast Railway.Tender No. SNTPBBS-032024-JKPR-GTA
Design, Supply, Erection, Testing & Commissioning of 132 KV Traction Substation,Sectioning post (SPs), and Sub sectioning post (SSPs) in 2x25KV System on Rajkhaswan-Nayagarh-Bolani section of Chakradharpur division of South Eastern Railway to meet3000MT loading target on EPC mode
OHE modification work for Up-gradation of existing 1 x 25 kV Electric Traction Systemto 2 x 25 kV AT Feeding System in Wardha-Ballarshah Section in Nagpur division ofCentral Railway to meet 3000 MT loading target
Design, Supply, Erection, Testing & Commissioning of 132 KV Traction SubstationSectioning post (SPs) and Sub sectioning post (SSPs) in 2x25KV System on Kharagpur -Bhadrak section of Kharagpur division of South Eastern Railway to meet 3000MT
Himachal
zone
Development of Distribution Infrastructure at CENTRAL ZONE of Himachal Pradeshunder the Revamped Reforms-based and Results-linked, Distribution Sector Scheme[Loss Reduction Works
Provision of MSDAC with existing DCTC at Stations (To serve as Dual detection) andreplacing balance AFTCs in MAS- GDR & MSB-TBM automatic block signalling sectionsof Chennai Division in Southern Railway.
Design, Supply, Erection, Testing and Commissioning of 2x25KV feeder line along thetrack with 25KV OHE modification works to meet 3000 MT loading target for UP & DNline of Garwa Road -Mahadiya Section of Dhanbad Division under E.C. Railway (Total229/458 RKM/TKM).
3rd& 4th line between Jarapada & Talcher Road and Construction of New line betweenAngul-Balram (MCRL Inner Corridor Phase-I Doubling 14 Kms).: Execution of balanceearthwork in formation, minor bridges, major bridges, P.way linking works, supply ofballast, S&T Buildings, Level Crossing and other Misc. works between Jarapada andTalcher Road excluding station yards in connection with 3rd& 4th line of Jarapada-Budhapank Project and between Angul & Balram including yards of MCRL InnerCorridor Phase-I Doubling
Construction Of (A) Elevated Metro Stations Seven Nos In Reach 3a, Namely (1) HingnaMount View, (2) Rajiv Nagar, (3) Wanadongri,(4) Apmc,(5)Raipur,(6) Hingna Bus Station(7) Hingna,(B) Elevated Metro Stations Three Nos In Reach 4a, Namely (1) Pardi,(2)Kapsi Khurd (3)Transport Nagar of NMRP Phase-2.
Design, Supply, Erection, Testing & Commissioning of Traction Sub Stations withassociated Switching Posts for upgradation work of electric traction system from 1X25to 2 X 25 KV AT feeding system in Gomoh - Patratu Section of Dhanbad Division of EastCentral Railway
Engineering, Procurement and Construction (EPC) contract Agreement for Doublingof Track between Parbhani to Parli stations (58.06Kms) (excluding Gangakhed yardfrom km 292.075 to km 298.85 =6.775 Km) including Electrification & Signaling worksin connection with Parbhani -Parli doubling project of South Central Railway in thestate of Maharashtra."
Earthwork in cutting and filling, blanketing, construction of minor bridges, majorbridges, RUB, ROB, retaining wall, level crossing, side drain, catch water drain, P.waywork and other ancillary works from IR Ch. 205.000 km to 260.2 Km between Kalipahari(inc.) to Pradhankhuta (exc.) in connection with construction of multi tracking RailwayBG line.
BSNL
BHARAT SANCHAR NIGAM LIMITED (A Government of India Enterprise)-Bid Documentfor Development (Creation, Upgradation and Operation & Maintenance) of Middlemile network of BharatNet on Design Build Operate and Maintain (DBOM) Model.Package No. -1 to 8.
OPEX (Operation & Maintenance) for 10 years for Pkg 3.
BharatNet
OPEX (Operation & Maintenance) for 10 years for Pkg 6.
KRIDE
Package C-4A: Construction of Nine (9 Nos.) Stations i.e. Elevated (1 No.) and At-Grade(8 Nos.) BSRP Stations of Corridor-4A at Heelalige, Singena Agrahara, Huskur, AmbedkarNagar, Carmelaram, Bellandur, Marathahalli, Doddanakundi, Kaggadasapuraincluding Civil, Structural, Entry / Exit Structure, Steel FOB, Roof Structures, PEB worksArchitectural finishes and E&M Works and Detailed Design & Engineering (DDC) withall associated works for Bengaluru Suburban Rail Project" (BSRP)"
SCR Construction Organization: Engineering Procurement Construction (EPC) Contractof Doubling of Track between Navipet station (Excl) From Km 446.900 to Indalvai Station(Incl) Km 482.900 (33.70 km), {Excluding Nizamabad Yard from Km 458.825 to 461.125(i.e.) 2.3Km} including Electrification & Signaling works in of South-Central Railway inconnection with Mudkhed-Medchal Doubling Project in the State of Telangana.
Punjab
RDSS
Development of Distribution Infrastructure Work for Package-3 Central Zone forExecution of Ht/Lt Infrastructure Loss Reduction Works Under Reforms- Based andResults-Linked, Revamped Distribution Sector Scheme (RDSS) In the State of Punjab.
Design, Supply, Erection, Testing & Commissioning of 132/55 KV Traction Substation,Sectioning post (SPs) and Sub sectioning post (SSPs) in 2 x 25 KV Traction System (ScottConnected Transformer) of Bhusaval - Khandwa Sections of Central Railway, to meet3000 MT loading target on EPC mode.
Koraput-Singapur Road Doubling Project: "Execution of 27 Nos of Major Bridges i.e.(22 Nos of Major Bridges & 5 Nos of ROBs) and earth work in formation of approaches,protection works and other connected miscellaneous works between Tikiri andBhalumaska stations in connection with Koraput-Singapur Road Doubling Project ofWaltair Divison, East Coast Railway
Design, Supply, Erection, Testing and Commissioning for upgradation of Electrictraction system from 1 x 25 KV to 2 x 25 KV traction system for Kharagpur (Excl.)-Tatanagar (Incl.) section of Kharagpur/Chakradharpur division of South EasternRailway to meet 3000 MT loading target.
Engineering, Procurement and Construction (EPC) for Design, Supply, Erection, Testing,Commissioning of 2x25 KV OHE & PSI System (TSSS, SPS & SSPS) Including ElectricalGeneral Services, Engineering & Telecommunication Works Between Rayadurga (Excl.)(Ch:205/463) To Pavagada (Incl.) (Ch:106/000) of TK-RDG Section (99.463 rkm/114.145tkm)
Construction of six lane connectivity to Visakhapatnam Port Road from Km 0.000(Sabbavaram bypass of Anakapalli - Anandapuram corridor) to Km 12.660 (Sheelanagar junction) of NH 516C on Hybrid Annuity Mode in the State of Andhra Pradeshunder NH(O)
Road
3.7.2.2 The list of projects 13 projects awarded to RVNL through Competitive Bidding in 2025-26 and under execution is as under:
Survey, design, supply, installation, testing and commissioning of KAVACH equipmentand other associated works over 790 RKM of Hubballi & Mysuru Divisions of SouthWestern Railway.
OHE Modification Work for Up-gradation of existing 1x25 KV Electric Traction Systemto 2x25 KV AT Feeding System in Itarsi - Amla Section in Nagpur Division of CentralRailway to meet 3000 MT Loading Target.
DMRC
Contract D2C-02; Part Design and Construction of Viaduct of Length 7.298 kms. fromChainage 1202.782 m to Chainage 8501.25 m including seven (07) stations (Onlyplatforms) namely Pushp Vihar, Saket District Court, Pushpa Bhawan, Chirag Delhi, GK-1, Andrews Ganj and Lajpat Nagar including Pre-Engineered Building Structure in allstations of Lajpat Nagar to Saket G Block Corridor of Delhi MRTS Phase-IV Project.
Upgradation work of Electric traction system from 1x25 kV to 2x25 kV traction systemfor Salem Jn. (SA) - Podanur Jn. (PTJ) & Irugur (IGU) - Coimbatore Jn. (CBE) - PodanurJn.(PTJ) section of Salem division of Southern Railway to meet 3000 MT loading target.
Design, Supply, Erection, Testing and Commissioning for OHE upgradation of existing1X25kV system to 2X25kV AT feeding system with feeder and earthing works inDuvvada- Rajahmundry & Samalkot - Kakinada Port section of Vijayawada Divisionunder South Central Railway, Total 195.5 RKM/ 391 TKM.
Design, Supply, Erection, Testing & Commissioning of Traction Sub Stations (Scott-Connected) Inclusive of Power Quality Compensating Equipment with AssociatedSwitching Posts (SP/SSP) for 2x25 kV AT Feeding System and SCADA & AutomaticFault Locator (AFL) In Jolarpettai Jn. - Salem Jn. (JTJ-SA) Section of Salem Division ofSouthern Railway In Connection With Mission 3000MT Loading Target.
(IRCON)
Supply of various signalling, telecommunications and EIMWB materials; Installation,Testing and Commissioning of Distributed/Centralised Electronic Interlocking (El)Installations at 10 new stations, viz., Surakachhar, Block Cabin, Katghora Road, Bhingra,Putuwa, Matin, Sendurgarh, Putipakhana, Dhangawan and Bhadi stations; 06 new IBSsin the Bhingra-Putuwa, Putuwa-Matin, Sendurgarh-Putipakhana, Putipakhana-Bhadi,BhadiDhangawan & Dhangawan-Pendra Road block sections; Installation, Testing andCommissioning of New Section Control System with Headquarters and Wayside TrainControl Communication Equipment I System in the Gevra Road - Pendra Road section;Installation, Testing and commissioning of new Telephone Exchange and EIMWBs atappropriate location(s) through execution of various signalling & telecommunicationsworks; alterations I modifications in the existing Panel Interlocking Installation atKusmunda Block Station (KBS) yard and the existing Electronic Interlocking Installationat East Cabin of the SECL SILO Siding (KMKA) yard including other miscellaneous works.
Provision of Video Surveillance System (VSS) at 441 D & E Category Stations along withAugmentation at 43 Stations (Categories A1, A, B, and C) over Southern Railway".
Construction of substructure of Important Bridge No. 50 (14x61.0 m) with Double Dtype well foundation for double line with RDSO 25 T Axel loading standard over riverGandak between Paniyahwa - Valmikinagar station in connection with Doubling workbetween Gorakhpur Cantt-Valmikinagar section of North Eastern Railway.
10
Setting up of Wagon POH Workshop of 200 Nos. Capacity at Kantabanji.
Design, Supply, Erection, Testing and Commissioning for OHE up gradation of existing1X25kV system to 2X25kV AT feeding system with feeder and earthing works inRamgundam(RDM) - Kazipet(KZJ) section of Secunderabad Division under SouthCentral Railway, Total 92 RKM/ 276 TKM.
12
Design, Supply, Erection, Testing & Commissioning of 220/132/55 KV TractionSubstation, Sectioning post (SPs) and Sub sectioning post (SSPs) in 2 x 25 KV TractionSystem (Scott Connected Transformer) of Daund - Solapur Sections of Central Railway,to meet 3000 MT loading target on EPC mode
13
Design and Construction of New Rail Cum Road Bridge No. 11 over river Ganga, 50Meters downstream of the existing old Malviya Bridge near Kashi Railway Station,including sub structure and super structure of the Bridge (8 X 108.5 m + 2 X 103.3 mOpen Web Steel Girder) for four line tracks on lower deck and six lane Road on upperdeck, including Railway and Road approaches as per GAD along with associated OHEWorks and General Electric works in Lucknow Division of Northern Railway at Varanasi,Uttar Pradesh, India
3.7.2.3 The list of Non-Railway Nomination projects are under execution is an under:
AAI
Construction of Sub-ways / Underpass to connect operational area to the AirportAuthority of India residential colony in Kolkata
VPA
Construction of internal flyovers to enhance the smooth evacuation of cargo andeliminate the eleven (11) level crossings that currently hindering the free flow oftraffic at VPA
Uzbakisthan
Supply, testing and commissioning of Solar PBcell for 250 K watt Electricity_Uzbakisthan
Tabarjal
Supply, testing and commissioning of Solar PBcell for 400 K watt Electricity_Tabarjal
NMDC
Construction of 15 nos Type III (600 Units), 01 No Type IV (40 Units), 01 No Type V(30 Units) Residential Towers, 01 HOP Bungalow and shopping complex in existingNMDC Bacheli Township, Chhattisgarh
Development of new township near Arvind College area and construction ofresidential towers in existing NMDC Kirandul Township, Chhattisgarh
Construction of Type-IV Residential Towers, Club house in NMDC Kirandul Townshipat Arvind College Area, Chhattisgarh
Construction of Residential Towers at Bacheli Complex under Capacity expansion ofBailadilla Iron Ore Deposit-10/11A NMDC Bacheli, Chhattisgarh.
Construction of Residential Towers at Bacheli under Capacity expansion of BailadilaIron Ore Deposit-5 NMDC Bacheli Township, Chhattisgarh
Refurbishment of Permanent Way of NMDC Sidings & Mobile Equipment Tracksincluding Maintenance at Kirandul & Bacheli, Chhattisgarh
3.8 Major Projects awarded through Bidding:
Rail Vikas Nigam Limited (RVNL) has been awarded three major packages(IN02, IN03 & IN04) of the yellow line of the project.
Package 02- (7 no. of Elevated Metro Stations)
Package 03- (10.9 Km Viaduct & 9 no. of Elevated Metro Stations)
Package 04 with JV - (1.3 km Viaduct & 2 no. of Elevated Metro Stations)
• The three-day CMRS visit from 15.03.2026 to 17.03.2026, covering SC-02 toMalviya Nagar station, has been successfully completed, including speedtrial and inspection of 6 km viaduct with 11 stations of the Indore MetroPriority Corridor (Yellow Line).
• Along with the earlier commissioned 5.9 km viaduct and 5 stations byRVNL, a total of 10.9 km viaduct and 16 stations (Pkg-02 & 03) securedthrough bidding stand completed.
• Commercial operation for remaining stretch is proposed in June 2026.
• Package IN-04: Works are currently in progress for Viaduct section and two nos. of elevated stations.
RVNL has won 3 contracts on bidding with Chennai Metro Rail Limited (CMRL) as part of it's massive Phase -II expansionin the year 2023 comprising Construction of 16 Nos of underground stations spread over 3 contract packages.
Package
Stations
Status
UG03
Kilpauk, Sterling Road, Nungambakkam, Gemini (AnnaFlyover), 1000 Lights, Chetpet, Royapettah - 7 Stations
Diaphragm wall & slab works in progress. Utilitydiversion works nearing completion.
UG04
RK Salai, Thirumayilai (C3 & C4), Mandaiveli,Greenways Road, Adyar Junction - 5 Stations
UG05
Adyar Depot, Indira Nagar, Tiruvanmiyur, TaramaniRoad Junction - 4 Stations
Diaphragm wall & Utility diversion works inprogress.
16 stations
All the 3 projects are progressing as per the timelines.The project includes some of the deepest stations onthe Chennai metro network and are being executedin the heart of the city. The projects on completion aredestined to transform the city of Chennai the significantcontribution of RVNL in shaping the urban infrastructurewill be recorded & recognized as a Nation building exercise.
UG-04 - RK SALAI STATION (North shaft Roof slab casting in progress)
The List of machineries mobilized for each package as on date is as follows:
Min Requirement
Actual Mobilization
Trench Cutter GRAB
Trench Cutter
GRAB
Piling Rig
UG - 3
3 3
UG - 4
4 1
UG - 5
2 2
Total
9 6
15
Project -1: Design and Construction of Elevated MetroViaduct of length 6.92 km.
Project Brief: DOC - 06.10.23 with original completiondate as 05-04.26 i.e. 30 Months.
(Approved EOT Date is 30.06.27).
Achievements:
1. 3.5km has been completed out of 6.93 Km.
2. Package involves CLC Construction work of 210m, ItsHammer Head construction work is 50% completed.
3. Physical (%) Completion - 71%
Project -2: Construction of 6 Nos of Elevated MetroStation - Reach-2A & 2 Nos of At-Grade Stations-Reach1Awith Track Supporting Structures.
(Reach2A- Approved EOT Date is 30.09.27).
Reach-2A Station - RCC Work -52% completed. Physical(%) Completion - 49%.
Reach-1A Station - RCC Work -98% completed. Finishing- 65% completed.
Physical (%) Completion - 85%.
Project -3: Construction of 6 Nos of Elevated MetroStations - Reach-2B
Project Brief: DOC - 09.07.24 with original completion dateas 04-01.27 i.e. 30 Months.
1. RCC Work - 34% completed.
2. Physical (%) Completion - 29%.
Project -4: Construction of 7 Nos of Elevated MetroStations - Reach-3A & 3 Nos in Reach 4A.
Project Brief: DOC - 16.12.24 with original completion dateas 14-06.27 i.e 30 Months project duration.
1. RCC Work - 17% completed.
2. Physical (%) Completion - 15%.
Under Bharatmala pariyojana, RVNL PlU/Waltair isexecuting the 12.25km 4-lane highway from Samarlakotato Achampeta junction as a part of port connectivityroad from Kakinada port to NH-16 (Kolkata-Chennai).Completion of this project will enhance logistic efficiencyand reduce logistics costs of freight movements.
LOA Issued
29-09-2022
Agreement Signed Date
01-05-2023
Appointed Date
17-08-2023
Physical Progress
93%
Kharicut canal is 137 years old canal system catering 10200ha command area for disposal of rain and storm water fromupstream catchment area between Sabarmati and Kharirivers and also used for irrigation purpose. Approximate23 Km length of Kharicut canal which was passing throughagricultural land and surrounding villages of AhmedabadCity is now passing through the dense eastern part ofAhmedabad city.
The work of development of the Kharicut Canal wasawarded by AMC on 19.10.2022 & RVNL's scope of workcovers a total length of 5.1 km, falling under Package 2& 3, from chainage 2500 to 7600. The primary objectiveof this project is to improve the environmental andsanitary conditions for residents living along the canal byeliminating unhygienic and foul-smelling surroundings,thereby reducing the risk of diseases. Additionally, thecanal alignment has been integrated with a four-lane road,aimed at easing traffic congestion and improving urbanmobility. The work has been successfully completed andthe Kharicut Canal development projects was inauguratedby Hon'ble Prime Minister Narendra Modi on 31.03.2026
The Vande Bharat Trainset Project is a major IndianRailways modernization initiative aimed at manufacturing120 semi-high-speed electric trainsets comprising1,920 cars, designed to operate at a speed of 160kmph. The project involves an estimated D14,400 crorefor manufacturing and around D20,000 crore formaintenance over a 35-year period, ensuring completelife-cycle support from design and production to long¬term depot maintenance.
The project is being executed by KINET Railway SolutionsLimited, a SPV created for this purpose, with shareholdingof LES - 40%, MWM - 35%, and RVNL - 25%. MWM
and LES are responsible for the core technical designand manufacturing support, while RVNL is handlingkey activities such as training, simulator deployment,and upgradation of manufacturing workshop andmaintenance depots.
Manufacturing activities for the first prototype are beingprogressively scaled up at the fully upgraded MRCFLatur facility. The final painting work of DTC-1 hasbeen completed, while in DTC-2, core welding workhas been completed, and painting along with otherfinishing activities are currently in progress. For DTC-3,manufacturing work is also under progress, indicatingsignificant advancement in trainset production.
Long-term maintenance of the trainsets will be supportedthrough three major depots: Jodhpur, targeted forcompletion by February 2027; Bengaluru contractawarded on 27.4.2026 with 30-month completionperiod from the date of award of contract; and Bijwasan,
where the tender is scheduled to open on 30.6.2026.Each depot will be equipped with all modern facilities tomaintain approximately 40 to 50 trainsets.
These fully air-conditioned, faster-accelerating VandeBharat trainsets are intended to gradually replaceconventional rolling stock and enhance indigenousmanufacturing capabilities. With modern features suchas premium interiors, automatic doors, CCTV surveillance,bio-vacuum toilets, and Divyangjan-friendly accessibility,the project is expected to significantly improve passengercomfort, safety, and overall travel experience and usher inan era of superior human transport over Indian Railways.
3.8.7 First overseas project in Maldives
RVNL bagged the first offshore order for development of aport and construction of allied infrastructure in Maldives,i.e. for development of UTF (Uthuru Thila Falhu- Island)Harbour Project. This is a strategic project of Governmentof India. The agreement was signed in January 2023.
The work has progressed well, with overall physicalprogress is 80% which includes 96% progress of marineworks & 60% in Landside works.
3.8.8 Araria-Thakurganj-Galgalia New BG LineElectrification Project (110 RKM/129 TKM) represents alandmark infrastructure initiative of strategic importancefor NFR, creating a vital alternate Katihar-Siliguri corridorand significantly strengthening rail connectivity toNortheast India and the border regions adjoiningNepal. The project involved comprehensive 25 kV ACrailway electrification infrastructure, including OverheadEquipment, Traction Substations, SP/SSP installations, andSCADA systems, thereby enabling efficient, reliable, andenvironment-friendly electric traction on this importantroute. One of the most notable benefits of the project is thereduction in the New Jalpaiguri-Delhi route distance fromapproximately 1,650 km to 1,409 km, resulting in a savingof about 241 km. This will translate into reduced traveltime, lower operating costs, improved asset utilization,enhanced throughput, and greater operational flexibilityfor passenger as well as freight services. The physicalprogress achieved under the project was substantial, witharound 2,790 OHE foundations cast, 2,884 masts andstructures erected, 2,821 bracket assemblies installed,and 153 OHE wiring shots executed, reflecting the scale,speed, and quality of execution.
The successful completion of the project was achieveddespite formidable challenges such as shortage ofskilled manpower and specialized equipment, highembankments, flood-prone terrain, sandy soil conditions,heavy rainfall, theft-prone locations, restricted siteaccess due to absence of level crossings, dependenceon other executing agencies, and uncertainties in trafficblock availability. These constraints were effectivelyaddressed through proactive planning, deployment ofadditional UTVs, crane, operators, and safety supervisors,engagement of multiple subcontractors for parallelexecution, enhanced security through retired RPFpersonnel, direct procurement of OHE conductors, andround-the-clock working at critical locations. The projectwas commissioned in phases, with Thakurganj (Excl.)-Bibiganj (Incl.) (42 RKM/47 TKM) commissionedon 30.06.2025, followed by Bibiganj (Excl.)-Araria(Excl.) and Araria Court (Excl.) (68 RKM/82 TKM) on15.10.2025, while the Kaliaganj 132/25 kV TSS wascommissioned on 23.12.2025. Completion of thisstrategically significant project ahead of the contractualschedule demonstrates RVNL's execution capability,project management excellence, and commitment tonation-building. It is also a milestone achievement asRVNL's first Railway Electrification project executedunder the BD mode, setting a strong benchmark forfuture BD-mode electrification works.
3.9 Strategic Railway Projects by RVNL
This transformative project in Uttarakhand is beingexecuted by RVNL. It will connect the state's remotehinterlands directly by rail, marking a new chapter in
regional connectivity and development. The projectspans 125 kms, and the route is charted through thechallenging Himalayan terrain. The project comprises 12new stations 28 tunnels with a cumulative tunnel lengthof 213 kms. and 19 major rail bridges, making it one ofthe most challenging projects currently underway in India.This line may also serve as the main feeder route for anyfuture Chardham connectivity.
The first block section, 5.7 km stretch between Virbhadraand Yog Nagari Rishikesh was successfully completed andcommissioned in March 2020. Out of the total 213 kmsof tunnel excavation planned, 205.82 km have alreadybeen completed along with 146.76 km of final lining. 8out of the 19 major rail bridges have been completed,ensuring vital connectivity across difficult river crossingsand valleys. In addition, Three key road bridges have beenconstructed to facilitate access to work sites and futurestations. 40 Breakthroughs out of 46 drives have beensuccessfully achieved.
The New Line is expected to be a catalyst for the socioeconomic development of the region and will considerablyreduce travel time. The Breakthrough of 14.57-km-long tunnel no 8 between Devprayag and Janasu waswitnessed by Hon'ble Railway Minister. This is the India'slongest transportation tunnel.
The 63Km long Railway line passes through thechallenging hill terrain of the lower Himalayas with a totalroute tunneling of 25.9 Km. The proposed electrified BGrail line shall enable regional development through theconnectivity of Himachal Pradesh with the national railwaynetwork, and will act as a gateway to connect with theinternational borders towards Leh for strategic purposes.
3.9.3.1 Indian Railways transferred the works of four majorprojects for extension of
Kolkata Metro to RVNL in March 2010 viz.
• Joka-BBD Bag via Majerhat (16.72 km)
• Dum Dum Airport-New Garia via Rajarhat (32 km)
• Baranagar-Barrackpore& Dakshineswar (14.5 km)
• Noapara (Ex.)-Baranagar (2.6 km)
3.9.3.2 Thereon RVNL was entrusted to build Metro corridors ofabout 65 km in Kolkata without any survey of undergroundutilities and without any DPR (Detailed Project Report). Theissues like removal of encroachments and relocation ofutilities along with delay in availability of traffic diversionhave affected the execution. RVNL has taken all possibleaction for implementation and early commissioning ofMetro projects for larger interest of people of Kolkata.
3.9.3.3 The foundation stone for Joka-BBD Bag project waslaid by Her Excellency, President of India on 22.01.2010.Subsequently, 2 packages for viaduct and 2 packages forstations were awarded in December 2010 and April 2012respectively. This entire Metro corridor has been plannedin 3 phases i.e. in 1st phase from Joka to Majerhat elevatedsection and in the 2nd phase from Majerhat to Mominpurin 3rd phase from Mominpur to Esplanade station asunderground section. Originally sanctioned as elevatedsection but Material Modification is sanctioned by Ministryof Railways for underground system from Mominpur toEsplanade. For construction of Mominpur station, workingpermission from Army HQ has been received only on20.03.2023 and work going on full swing.
In the Metro corridor from Joka to Majerhat, from Jokato Taratala (Phase-I) 6.50 Km has been inaugurated byHon'ble Prime Minister on 30.12.2022 & commercialservices started by Metro Railway on 02.01.2023. Anotherphase of 1.25 Km from Taratala to Majerhat has beeninaugurated by Hon'ble Prime Minister on 06.03.2024 &commercial services started by Metro Railway has beencommenced from 15.03.2024. The station over yard atMajerhat is on three layers. Beyond Majerhat, the Jokato Majerhat Metro Corridor is being extended uptoEsplanade going underground from Mominpore ramp.The Works contract for the underground section has beenawarded and the works of underground portion has beenstarted. Working permission has accorded after Hon'bleHigh Court/ Kolkata's clearance for execution in Defenceland in the Maidan area for the public interest of Kolkata.The NOC from Victoria Memorial Trust has been receivedrecently to go ahead with underground station nearVictoria Memorial.
Since this Metro stretch is a standalone system, aMaintenance Depot has been developed in Joka whichis under operation. Earlier, due to non-availability of land(24.48 hectare), the tender for the depot was dischargedtwice, once in February 2013 and again on October 2017.
The commissioning is planned in 3 phases i.e (a)Ph-I-Joka-Taratala, (b)Ph-II-Taratala-Majerhat, (c) Ph-III- Majerhat-Esplanade. After starting of commercial services of 1st & 2ndphase commissioning the outskirt population of Kolkatahas been connected to Kolkata which is a great relief forthe people residing away from Kolkata but normally cometo Kolkata on daily basis doing a tough journey every day.On Phase 3 work is in progress, for tunnelling both TBMsnamely DURGA and DIVYA have commenced miningtowards Victoria, progress of mining is 1594 m and 1264m, respectively. Further, Station Construction activitiesare in progress at Victoria and Park Street Stations, whileworks at Khidderpore and Esplanade Stations are yet tocommence. At Victoria Station, construction of the D-Wall,piles, and top slab has been completed, and the concourse
slab is currently in progress. At Park Street Station, D-Wallconstruction is in progress. Critical issues affectingprogress are shifting of B. C. Roy Market, transfer of landfrom the Consulate General of Nepal, and relocation of thePWD office.
In the section of New Garia to Rabindra Tirtha of Dum DumAirport-New Garia project, initially 4 packages of Viaductwere awarded on 21.10.2011. About 20 km viaduct hasbeen completed. The contracts for 21 stations (3 packages)were awarded on 05.03.2014. Out of 21 stations, stationland for Technopolis Metro station is now handed over.The project got delayed because of issues relating to landacquisition, traffic diversion, utility diversion and otherpermission over busy EM Bypass road. Further, changeof alignment proposed by State Government whereunauthorized buildings were constructed even after theGazette Notification for Metro construction, and otherimpediments like shifting of markets, traffic guard, raisingof 220 KV overhead line, removal of encroachments,etc. slowed down the progress of work. Substantialpart of these impediments have been either removedand the balance are on the way of being removed. Thealignment from City Centre-II to Airport is now approvedby State Government after long persuasion and contractfor construction of Metro beyond Titumir to Airporthas been awarded on 18.01.2021, The work is underprogress. In this section the commissioning was plannedin 3 phases phases earlier i.e (a) Ph-I-New Garia-HemantaMukhopadhyay, (b)Ph-II-Hemanta Mukhopadhyay to SaltLake Sector-V and (c) Ph-III- Salt Lake Sector-V to Airport.Due to unavailable work front in various stretches of thecorridor and considering commissioning point of viewthe phases were revised i.e. (a) Ph-I-New Garia-HemantaMukhopadhyay, (b)Ph-II-Hemanta Mukhopadhyay toBeleghata, (c) Ph-III Beleghata to Salt Lake Sector-V and(d) Ph-IV- Salt Lake Sector-V to City Centre 2 and (e)Ph-VCity Centre 2 to Airport.
Now in present scenario, (a) Ph-I-New Garia-HemantaMukhopadhyay (5.4 Km) commercial run has been startedfrom 15.03.2024 after being dedicated to the nation by theHon'ble Prime Minister on 06.03.2024, (b) Ph-II-HemantaMukhopadhyay to Beleghata (4.46 Km) commercial runhas been started from 25.08.2025 after being dedicated tothe nation by the Hon'ble Prime Minister on 22.08.2025. ,(c) Ph-III Beleghata to Salt Lake Sector-V was planned forcommission in Dec'2026, however due to non-availabilityof traffic diversion block between Belaghata to GourKishore Ghosh stations, work of launching of viaduct isheld up since Feb 2025 to mid of May 2026. Now workhas been started again and it will take 5-6 months tocomplete the remaining work. Balance 02 phase i.e. (d)Ph-IV- Salt Lake Sector-V to City Centre 2 has been plannedfor commission in Jun'2027 and (e)Ph-V City Centre 2 toAirport are planned for commission upto Dec'2027.
For Baranagar-Barrackpore & Dakshineswar and Noapara-Baranagar, the work was planned in 2 phases i.e. the firstphase being Noapara-Baranagar-Dakshineswar and in thesecond phase, from Baranagar-Barrackpore. The first phase,i.e. from Noapara to Dakshineswar, the Metro corridor hasbeen inaugurated and dedicated to the Nation by Hon'blePrime Minister on 22.02.2021 for public use.
For the second phase of this Metro corridor, i.e.Baranagar-Barrackpore, a MoU was signed between StateGovernment, Metro Railway and RVNL in October 2011.Original sanctioned alignment via B.T. Road was notagreed by State Govt. despite signing of the MoU in Oct'2011 for closing of 2 pipelines and even after completionof new pipeline work of 64" dia by State Govt. Repeatedobservations raised by KMC have been complied by RVNL.However, Technical approval / NOC from State Govt. isstill awaited. Pursuant to the Railway Board review on24.05.2026, a joint meeting with KMC, RVNL, and DM/Barasat was held on 25.05.2026. As per the Minutes ofthe meeting dated 25.05.2026, KMC proposed to sacrificethe existing 42-inch dia age old pipeline whereas RVNLrequested to KMC for sacrificing the existing age old 48-inch dia pipeline with replacement of a new peoposed72-inch dia MS pipeline from Tallah (TPS) to Palta (IGWTP)along with Metro construction work in parallel to maintainuninterrupted water supply to the City people and mitigatethe future demand also. This will ease finalization of Metroalignment at earliest from Baranagar (Ex.) to Barrack poreas per the earlier submitted proposal to KMC. In the VCheld on 26.05.2026 between Chairman & CEO/RailwayBoard and Chief Secretary/GoWB, RVNL was advised toexamine laying a new 72-inch dia. pipeline, while KMC wasdirected to engage I IT KGP to assess adequacy of watersupply under the proposed arrangement.
(i) Noarpara - Baranagar - Dakshineswar: The projecthas been inaugurated by Hon'ble PM on 22.02.2021and Commercial Operation of train service startedw.e.f. 23.02.2021.
(ii) Joka-Taratala in Joka - Esplanade Metro Corridor:9.0 km of continuous stretch from Joka Depot hasbeen completed. Major structures and stations havebeen completed at Joka, Thakurpukur, Shaker Bazar,Behala Chowrasta, Behala Bazaar, Taratala. The firstphase i.e. Joka to Taratala of Joka-Esplanade Sectionhas been inaugurated by Hon'ble Prime Minister on30.12.2022 and commissioned on the same day.
(iii) Taratala-Majerhat Joka - Esplanade Metro Corridor:2nd phase of 1.25 Km has been inaugurated by Hon'blePM on 06.03.2024 and Commercial Operation of trainservice started w.e.f. 15.03.2024.
(iv) New Garia-Hemanta Mukhopadhyay in New Garia-Airport corridor: 5.4 Km has been inaugurated
by Hon'ble PM on 06.03.2024 and CommercialOperation of train service started w.e.f. 15.03.2024.
(v) Hemanta Mukhopadhyay to Beleghata in New Garia-Airport corridor: 4.4 Km commercial run has beenstarted from 25.08.2025 after being dedicated to thenation by the Hon'ble Prime Minister on 22.08.2025.
3.10 Accidents
During 2025-26, no accident was reported from any of theproject sites of RVNL.
3.11 ADB funded projects:
The first ADB loan (IND-1981) sanctioned for "RailwaySector Improvement" was closed on 31.12.2011. A2nd ADB Loan has been sanctioned for funding of 5projects, namely:
• Raipur-Titlagarh doubling
• Sambalpur-Titlagarh doubling
• Hospet-Tinaighat doubling
• Daund-Gulbarga doubling
• Pune-Guntakal Railway Electrification
The funding by ADB requires compliance of variousloan covenants on resettlement and rehabilitation ofproject affected persons, procurement of works andstores following international competitive bidding andimplementation of plans for mitigation of social andenvironmental impact norms. A Multi Tranche FinancingFacility of $ 500 million has been agreed to by ADB. Theloan agreement for first Tranche (Loan No. 2793-IND) ofthis MFF for an amount of $ 150 million was signed in July2012 and the loan agreement for second Tranche (Loan No.3108-IND) of this MFF for an amount of $ 130 million wassigned in February 2014, the loan was closed on 20.12.2019Project Agreement & Loan Agreement against ADB loanNo. 3623-IND (Railway Sector Investment Program-Tranche III) for an amount of $ 130 million have beensigned on 16.3.2018 and made effective on 07.06.2018.The loan was fully disbursed on 29 October 2021 and theloan account was closed effective on 2 December 2021.Project Completion Report (PCR) submitted to ADB andloan is fully closed.
Currently, the following five railway projects are fundedthrough the Asian Development Bank (ADB) loan:
• Raipur-Titlagarh Doubling
• Sambalpur-Titlagarh Doubling
• Hospet-Tinaighat Doubling
• Daund-Gulbarga Doubling
The ADB funding requires compliance with respect tofollowing parameters:
• Resettlement & rehabilitation of affected people
• International competitive bidding for procurement
• Environmental and social safeguard plans duringimplementation
The ADB loan supported railway capacity expansionand electrification projects in India, are tied to strictsafeguards on social justice, environmental protection,and transparent procurement practices.
3.12Contracting:
As the size of projects being executed by RVNL is quitelarge, to ensure fast award and execution of projects,RVNL invites tenders consisting of multiple packages.Each tender may consist of up to 3 contract packages. Thisapproach has a number of advantages such as:
a) Multiple contracts can be awarded through onetender which saves time and effort in invitation andfinalization of tenders.
b) Both small and large agencies can compete for anycontract package which increases competition.
c) Large agencies who are capable of executing bigcontracts can quote for multiple packages to achieveeconomy of scale and pass on the benefit to RVNLby quoting discounts in case of award of more thanone package.
d) Smaller agencies, which would not be eligible toquote if the tender for the project was floated ina single package, are now able to compete in anyof the contract packages individually as they maymeet the qualification requirements of individualpackages which are of comparatively smaller value.
During 2025-26, contracts worth approximatelyD4339.55 Cr. were awarded.
The following major contracts were awarded by theCompany during the year:
• PACKAGE - 1C : Construction of Roadbed, MinorBridges, Buildings, Installation of Track (excludingSupply of Rails, Sleeper & Thick Web Switches), andother Civil Engineering and General Electrical worksin connection with New BG Railway Line betweenPipaliya Nankar (excl.) - Budni (incl.) Stations(chainages 129.000 - 198.000 km) in Indore-Budnisection of Bhopal Division West Central Railway inMadhya Pradesh State, India (D755.79crore)
• “Package-1B : Construction of Roadbed, MinorBridges, Buildings, Installation of Track (ExcludingSupply of Rails, Sleeper & Thick Web Switches), andother Civil Engineering and General Electrical Worksin Connection With New BG Railway Line BetweenKheri (Excl) - PipaliyaNankar Station (Chainages57.400 - 129.000 Km) in Indore-Budni Section of
Bhopal Division West Central Railway In MadhyaPradesh State, India" (D699.98 Crore)
• "Construction of Foundations, Substructure &Superstructure along With River Training/ProtectionWork, Temporary & Allied works for 2 Important /Major Bridges in between Chainage Km 36+100To Km 40+480, in connection with Bhanupali-Bilaspur-Beri New Railway Line in District Bilaspur ofHimachal Pradesh State, India" (D 401.98 Crore)
• Supply, Erection, Testing & Commissioning OfElectro Mechanical (E&M comprising of 33/11kv& 11/0.433kv GIS Substations, HT & LT Cables,Lighting, Ups System, Ventilation Systems & FireFighting Systems and associated works for TunnelT-1, T-2, T-3 & T-4 under package E-1 Of Rishikesh-Karanprayag New BG Rail Line Project In The StateOf Uttarakhand. (D388.39 Crore)
• "Construction of Foundations, Substructure &Superstructure along With River Training/ProtectionWork, Earthwork & allied works for Rail Bridge 16A(CH. 0+901.158 to 1+066.525), Rail Bridge 16B(CH.0+888.967 TO 1+054.711) and Road Bridge 2(CH. 0+050 TO 0+167.995) at Karanprayag Yard inconnection with New Single Line Broad Gauge RailLink Between Rishikesh and Karanprayag (125km) inState of Uttarakhand, India" (D283.59crore)
• Design, Supply, Erection & Testing andcommissioning of Electrical and Mechanical worksof 4 stations including tunnels in Mominpur-Esplanade underground section in Joka-EsplanadeCorridor of Metro Railway, Kolkata, (West Bengal),India (D229.80crore)
• Package 4 : Construction of Station Buildings,Platforms, FOBS, Circulating area amenities andother Misc. Yard Structures along with GeneralElectrical works in Karanprayag Yard (km - 124+990)in connection with Rishikesh - Karanprayag 125kmlong New BG Rail Line Project in the State ofUttarakhand, India. (D 224.10CRORE)
• Construction of Viaduct of length 2.405km (ch:-2.705 to 5.110) for Electrified New BG Railway Linebetween Mangaliyagaon and Panod Stations inBhopal Division of West Central Railway In MadhyaPradesh State, INDIA. (D 161.17CRORE)
• PACKAGE 2 : Construction of Station Buildings,Platforms, FOBS, Circulating area amenities andother Misc. Yard Structures along with GeneralElectrical Works in Devprayag (km - 47+390),Janasu(km - 62+220), Maletha (km - 66+970) andSrinagar (km-72+148) Yards in connection withRishikesh - Karanprayag 125km long New BGRail Line Project in the state of Uttarakhand, India(D 144.95CRORE)
• "Special Limited Tender for "Construction ofReinforced Soil Wall from (Ch. 124+460 to 124+900)and Formation Works Ch. 125+180 to 125+887)along with slope stabilization in connection withNew Single Line Broad Gauge Rail Link betweenRishikesh and Karanprayag (125km) in the State ofUttarakhand, India" (D128.17crore)
• Package 3 : Construction sf Station Buildings,Platforms, FOBs, Circulating area amenities andother misc. yard structures along with generalelectrical works in Dhari Devi (Km-83+389), Tilani(Km-101 +004),Gholtir (Km 108+554.991) andGauchar (Km-116+393.588) yards in connectionwith Rishikesh - Karnprayag 125km Long New BGRail Line Project in the State of Uttarakhand, India.(D106.61crore)
• "Package-VI - Installation and linking of BG railwaytrack, P-way material supply, Track Ballast supply,Mobile Flash Butt Welding of Joint and all otherassociated P-way work (excluding supply of rails,line/ordinary wider base PSC sleepers) in sectionbetween Yavatmal (Ex.) to Belgaon (Ex.) from Km78 to Km 157 in connection with Yavatmal-NandedNew BG line of Central Railway in Maharashtra State,India" (D100.64crore)
• Design, Engineering, Supply, Erection, Testing &Commissioning of Electro Mechanical (E&M) Systemwhich includes 33/11kV Substations & 11/0.433kVSubstations, 33kV & 11kV Power Cable Network,DG Sets, Ventilation & Control System, lighting, UPSsystem, Fire Fighting system & SCADA System, etc.and associated works complete in all respect asrequired for tunnel T-1 to T-7 between Ch. 0.000 toCh. 20.000 in connection of Bhanupli-Bilaspur-BeriNew Railway Line Broad Gauge Rail Link in DistrictsRupnagar of Punjab and Bilaspur of HimachalPradesh States, India". (D86.38crore)
• Design, Supply, Erection, Testing & Commissioningof Traction Sub Stations with associated SwitchingPosts for 2 x 25 KV AT feeding system in Phaphamau-Janghai sections (incl. Phaphamau-Prayagrajsection) of Lucknow Division of Northern Railwayin connection with doubling of tracks betweenPhaphamau(Excl.)Janghai(Excl.) Section of LucknowDivision on N. Railway in the state of Uttar Pradesh,India on EPC mode (D65.67crore)
• 'PACKAGE - EHT -3: Design, Supply, Erection, Testingand Commissioning of 132KV /220KV transmissionline owned by Madhya Pradesh power transmissioncompany limited as diversion / modification work(including identification & resolution of row issuesby payment of compensation to the affecting landowners) due to infringement in the alignmentof proposed new B.G. Railway line betweenmangaliyagaon (Indore) - Budni section on Ratlamdivision of western railway and Bhopal divisionof West Central Railway in the State of MadhyaPradesh, India' (D59.88crore)
• Extension of Beleghata and Barun Sengupta MetroStations above platform level in New Garia-Airportmetro corridor of Kolkata Metro Railway, WestBengal, India. (D55.40crore)
• Construction Of Station Buildings, Platforms, Fobs,Circulating area amenities and other misc. yardstructures along with general electrical works inShivpuri (Km - 18+095) and Byasi (Km-32+395)Yards in connection with Rishikesh - Karnprayag125 km Long New BG Rail Line Project in the State ofUttarakhand, India). (D51.67crore)
• Package-3: Design, Supply, Erection, Testing andCommissioning of 220KV, 3Phase D/C transmissionline (12KM) from Kumhari (PGCIL GSS) to Bhilai TSS,Bhilai TSS to Rajnandgaon TSS (55 KM), RajnandgaonTSS to Paniajob TSS (45KM), Bhilai TSS to Urkura BusCoupler (35 KM) and Urkura Bus Coupler to UrkuraTSS (5 KM); Extension of 220KV bay at Kumhari(PGCIL); LILO 2 Nos at Bhilai&Rajnandgaon andBus Coupler 1 No at Urkura along with associatedworks in connection with Direct Power Supplyfrom Central Generating Agencies over South EastCentral Railway, Bilaspur, Chhattisgarh (India).(D49.95crore)
• "Design, Supply, Installation, Testing &Commissioning of Integrated CommunicationSystem for Tunnels (T1-T7) consisting of VHFcommunication, CCTV, PA System, EmergencyCall and Service Telephone & IPIS at stations inconnection with New Single Broad-Gauge Rail LineBetween the Bhanupali-Bilaspur-Beri Section inthe state of Punjab and Himachal Pradesh, India".(D47.25 Crore)
• Package - EHT - 1: Design, Supply, Erection,Testing and Commissioning of 400KV transmissionline owned by Power Grid Corporation of Indialimited as diversion / modification work (includingsetup of emergency restoration system (ERS) withidentification & resolution of row issues by paymentof compensation to the affecting land owners) dueto infringement in the alignment of proposed NewB.G. Railway line between Mangaliyagaon (Indore) -Budni section on Ratlam division of Western Railwayand Bhopal division of West Central Railway in thestate of Madhya Pradesh, India. (D46.11 Crore)
• 'Package - EHT -3: Design, Supply, Erection, Testingand Commissioning of 132KV /220KV Transmissionline owned by Madhya Pradesh Power Transmissioncompany limited as diversion / Modification work(including identification & resolution of row issuesby payment of compensation to the affecting land
owners) due to infringement in the alignmentof proposed New B.G. railway line betweenMangaliyagaon (Indore) - Budni section on Ratlamdivision of western railway and Bhopal division ofWest Central Railway in the state of Madhya Pradesh,India' (D32.95 Crore)
• Design, Supply, Erection, Testing & Commissioningof 2X25 KV, 50 Hz, Single Phase, Traction Over¬Head Equipment, Switching Station, SCADA,General Electrical Services Works along withTelecommunication work, Civil Engineering workand other associated works between section Taroki(Excl.) - Rowghat (Incl.) 18.85 RKM / 24.74 TKMof Raipur Division in South East Central Railway,Chhattisgarh, INDIA. (D32.44crore)
• 'Package - EHT - 4: Design, Supply, Erection, Testingand Commissioning of 132KV / 220KV TransmissionLine owned by Madhya Pradesh Power TransmissionCompany Limited as Diversion /Modification Work(Including Identification & Resolution Of Row Issuesby payment of Compensation To The Effecting LandOwners) due to infringement in the alignmentof proposed New B.G. Railway Line betweenMangaliyagaon (Indore) - Budni Section on RatlamDivision of Western Railway and Bhopal Divisionof West Central Railway in the State of MadhyaPradesh, India’(D25.08crore)
• 'Conversion of 33kV / 11kV Overhead Power Lines/ Distribution Lines into Underground Cable Linesincluding Replacement / Relocation of associatedlines & Distribution Transformers with H-Beam, PCCPoles structure / lines to remove infringement ofAlignment of New Electrified Broad Gauge RailwayLine between Kheri (57.400 KM) to Pipaliya Nanker(129.00 KM) Section in Bhopal Division of WestCentral Railway in the State of Madhya Pradesh,India' (D21.86 Crore)
• Execution of P.Way track linking, precast bridge withlaunching, fixing of RH Girder and miscellaneousbuilding works for doubling of Cansaulim - Vascosection of Hospet-Vasco doubling project in theState of Goa" . (D 19.43 Crore)
• Krishna Canal junction Yard remodellig - Balanceworks at KCC yard including formation works,upgrading of Platform No.8 & 9, extension ofminor bridges, track linking, assembling & layingof P&C, Dismantling of P&C, Modification of FOB,Slewing of track, linking of track in connection withConstruction of 3rd Line between KCC-KRV Sectionin Vijaywada Division of South Central Railway,india" (D 15.44 Crore)
• General Electrical, Power Distribution, Lift, Firedetection & Alarm and Fire Fighting works for 240
nos. Dwelling Units (DUs) at Panagarh MilitaryStation, West Bengal, India" (D11.30 Crore)
• 'Improvement of long haul siding and constructionof goods loading platform at Sundlak station inconnection with Bina - Kota doubling project inKota Division of West Central Railway. (D9.91 crore)
• Design, Supply, Erection, Testing & Commissioningof Feeder wire, AEC, BEC, Super Mast, AutoTransformer and other modificaiton work for 2x25KVtraction system between section Dallirajhara (Excl.)- Bhanupratappur SP (Excl.) 27.850 RKM/30.850 TKMof Raipur Division in South East Central Railway,Chhattisgarh, India (D7.86crore)
• Construction of HL Platform, Surfacing, Fixingof chequered tiles at Island platform No. 2 & 3of KVQ, 4 & 5 of MDJ and 1,2,3 & 4 of SQS Stationand other Miscellaneous Works in connection withconstruction of 3rd Line from Sonnagar to GarhwaRoad in DDU Division of East Central Railway(D7.66crore)
• 'Construction of 6 m wide Foot Over Bridge andother miscellaneous work at Japla (JPL) yard inconnection with construction of 3rd line fromSonnagar to Garhwa Road in DDU Division of EastCentral Railway' (D7.11crore)
• Construction of W/R wall, U- through wall of 5 nos.bridges, Approach road of 2 RUBs and Approachroad of 3 Halts and other misc. work from Gonpurato Jatdumri section in connection with constructionof new line from Neora (including) to Jatdumri(excluding) (18.40 Km) on Danapur Division of EastCentral Railway in Bihar, India (D7.06 Crore)
• Construction of G+4 Residential Building, G+1 StoreBuilding, 2 nos. Container for Storage and otherallied works in connection with shifting of 42 nos.Dhobi line hutments inside premises of KolkataArmed Police HQ, Kolkata in connection withconstruction of Mominpur - Esplanade undergroundsection of Joka - Esplanade Metro Railway Corridor.(D6.86 Crore)
• Construction of RVNL office building at Saket Nagar,Bhopal on Railway land’ (D6.48 Crore)
• Construction of G+2 Building and other allied worksinside premises of Consulate General of Nepal atNational Library Avenue, Kolkata in connection withConstruction of Mominpur-Esplanade undergroundSection of Joka-Esplanade Metro Railway Corridor"(D6.25 Crore)
• Execution for Laying of 1100 mm and 16mm wallthick MS pipe by Trenchless Method and Pushingthe Pipe by Hydraulic Jack in the side drain betweenDuburi - Baguapal Block Section in connection with
Angul-Sukinda Railway Line under Khurda RoadDivision of East Coast Railway (D6.21 Crore)
• Construction of Goods platform (With releasedPSC Sleepers), linking of track for line no.7 atJapla and other miscellaneous work at Japla (JPL)in connection with construction of 3rd line fromSonnagar to Garhwa Road in DDU Division of EastCentral Railway (D5.72 crore)
• 'Modification of existing 132KV Vontithadi-GarividiS/C line to improve the ground clearance for 3rdline constructed in between Gotlam-VizianagaramRailway crossing (Loc.No:113-114) at railway Loc.No.463/12 near KL Puram (V), Vizianagaram District inconnection with 3rd line project between Titlagarh-Vizianagaram in WAT division of East coast Railway,India (D5.64 crore)
• Repair and Mainenance contract of Railway OfficersEncalve, Moti Bagh, New Delhi (D5.48 crore)
• Construction of U-trough wall (LHS & RHS) of RUB,Br.No.26 (Ch.11+650) in connection with Neora-Jatdumri New bg Line Project (D5.30 crore)
• Package- AAI Subway: "Construction of AAI Subway/Underpass across VIP Road from Airport OperationalArea to AAI Residential Colony at NSCBI Airport,Kolkata passing below the Metro Ramp structureof New Garia-Airport Metro Corridor, West Bengal.(D5.12 crore)
• Execution of General Electrical works for the sectionGotlam(Excl.)-Vizinagaram(Excl.) including Bye-pass line between stations Gotlam-Nellimarla andassociated temporary diversion of power lines inconnection with Vizianagram - Titlagarh 3rd lineworks between TIG-VZM in WAT division of EastCoast Railway, India. (D3.40 crore)
• Augmentation of existing 11/0.433 KV Sub¬Station including Supply, Installation, testing &commissioning of 02 nos.1MVA power transformers,LT & HT panels, laying of HT & LT cables and other
associated works including heavy repair of existingsubstation building at DRM office Moradabad inconnection with New MTCC Building at Moradabadfor 125kM New BG Rail Line between Rishikeshand Karnprayag in the State of Uttarakhand.(D3.18 crore)
• Provision of Barricading as Protection Measure indeep cutting Area of Angul - Sukinda New Line nearDuburiunder Khurda road division of East coastRailway in State of Odisha, India" (D1.39 crore)
Besides these Works Contract, FLS, DD&PMC and PMCcontracts on nomination basis for D41.89 crore have alsobeen awarded during 2025-26.
4. PROJECT PLANNING & DEVELOPMENT4.1 PUBLIC PRIVATE PARTNERSHIP (PPP) in Indian RailwayConnectivity ProjectsStrategic Overview: -
As part of Rail Vikas Nigam Limited's (RVNL) mandateto undertake project development, mobilize financialresources, and implement projects aimed at strengtheningthe Golden Quadrilateral network and enhancingconnectivity to various ports, five Special Purpose Vehicles(SPVs) have been incorporated as Joint Venture (JV)companies on Public Private Partnership (PPP) models.RVNL holds a minimum equity participation of 26% in eachof these SPVs, demonstrating its strategic commitment inthe development and implementation of these critical railinfrastructure projects.
Through these SPVs, RVNL has successfully mobilized acumulative investment of C10,839.47 crore, comprisingC3,959.91 crore through equity and C6,879.56 crorethrough debt financing. Out of the total investmentmobilized, RVNL has contributed C1,544.65 crore towardsequity in these five SPVs, which constitutes only about14.25% of the aggregate project investment, therebydemonstrating significant leveraging of resources throughthe SPV model (refer table below).
SPV
(Km)
Paid-up
Equity
RVNL
Debt
Investment
Kutch Railway Company Ltd.
821.00
410.50
1,584.41
2,405.41
Bharuch Dahej Railway Company Ltd.
67.12
155.11
55.00
230.00
385.11
Krishnapatnam Railway Company Ltd.
113
625.00
311.00
1,074.97
1,699.97
Haridaspur Paradip Railway Company Ltd.
1,300.00
390.00
1,451.61
2,751.61
Angul Sukinda Railway Ltd.
104
1,058.80
378.15
2,538.57
3,597.37
667.12
3,959.91
1,544.65
6,879.56
10,839.47
(a) Kutch Railway Company Limited (KRC)Salient Features of the Project: -a) Kutch Railway Company Limited (KRC)
Railway/Division/State
Western Railway / Ahmedabad / Gujarat
Project Type& Length
Gauge Conversion, 301 Km
Year of Sanction
1988-89
Date of Transfer to RVNL
14.05.2003
Date of MoU
03.01.2004
Date of EOI
NA
Date of Incorporation
22.01.2004
Shareholders Agreement signed on
22.04.2004
Traffic Guarantee Agreement signed on
Not signed
Concession Agreement signed on
08.11.2005
Construction Agreement signed on
GC - 06.10.2005, DL-13.08.2018, RE - 09.02.2021
O&M Agreement signed on
21.08.2005
Original cost (DCrore)
344.63
Project cost (D Crore)
550.00
Equity Participants
Rail Vikas Nigam Limited 410.50
50.00%
Deendayal Port Authority 213.46
26.00%
Adani Ports & SEZ Limited 164.20
20.00%
Govt. of Gujarat 32.84
4.00%
Total (D Crore) 821.00
Note: -
100.0%
• Bonus shares amounting to C50 crore issued irratio of 1:4.
i November 2011 in the
• Doubling and Railway Electrification works
executed at a cost of
C3,153.70 crore and C755 crore respectively. Full project commissionedon 24.02.2023 and RE completed on 24.03.2023.
Commercial Operations Date (COD)
01.07.2006
tailway/Division/State Western Railway/Vadodara/Gujarat
Jroject Type& Length Gauge Conversion, 67.12 Km
ear of Sanction
2005-06
22.03.2006
13.01.2005
27.02.2006
15.11.2006
hareholders Agreement signed on
12.01.2007
rraffic Guarantee Agreement signed on
oncession Agreement signed on
25.06.2008
onstruction Agreement signed on
01.07.2009
&M Agreement signed on
Driginal cost (D Crore)
262.00
Jroject cost (D Crore)
395.00
Rail Vikas Nigam Limited
35.46%
Gujarat Maritime Board
17.86
11.51%
Gujarat Industrial Development Corporation
Adani Petronet (Dahej) Port Private Limited
17.33
11.17%
Gujarat Narmada Valley Fertilizer Company
13.53
8.72%
Hindalco Industries Limited
Dahej SEZ LimitedTexmaco West Rail Limited
10.00
6.45%
(Formerly known as Jindal RailInfrastructure Limited)
Total (D Crore)
ommercial Operations Date (COD)
08.03.2012
South Central Railway/Vijayawada/Andhra Pradesh
New Line, 113.12 Km
2006-07
22.11.2005
11.10.2006
13.10.2006
Participation Agreement- I signed on
23.02.2008
Participation Agreement -II signed on
12.10.2020
23.11.2007
29.09.2011
06.01.2012
Revised O&M Agreement signed on
08.11.2021
Original cost (D Crore)
732.81
Estimated Project cost (D Crore)
2831.00
Rail Vikas Nigam Limited 311.00
49.76%
Sagarmala Development Co. Ltd 125.00
Adani Krishnapatnam Port Co Ltd 81.00
12.96%
National Mineral Development Corporation Ltd 40.00
6.40%
Govt. of Andhra Pradesh 35.00
5.60%
Bramhani Industries Ltd 33.00
5.28%
Total (D Crore) 625.00
a. Venkatachalem - Nidiguntapalem - 01.10.2008
b. Nidiguntapalem - Krishnapatnam - 28.02.2009
c. Doubling of 21 km line from VKT to KAPT - 02.03.2014
d. The complete connectivity was commissioned in June 2019
East Coast Railway/Khurda Road/Odisha
Project Type & Length
New Line, 82 Km
1996-97
24.02.2005
21.01.2006
25.09.2006
04.04.2008
20.12.2007
11.08.2009
24.10.2021
301.64
2397.00
30.00%
Sagarmala Development Company Ltd.
336.79
25.91%
Govt. of Odisha
237.79
18.29%
Paradip Port Trust
138.52
10.66%
Orissa Mining Corporation
110.00
8.46%
Essel Mining & Industries Ltd
30.00
2.31%
Rungta Mines Ltd
MSPL Ltd
15.00
1.15%
Jindal Steel Power Limited
5.00
0.38%
Steel Authority of India Ltd.
Odisha Industrial InfrastructureDevelopment Corporation (IDCO)
1.90
0.15%
1300.0
30.07.2020
New Line with Y-connection, 104.242 Km
1997-98
22.02.2006
19.11.2008
17.06.2008
20.02.2009
27.05.2009
14.05.2010
24.04.2015
391.00
2913.00
35.71%
259.47
24.51%
CONCOR
250.80
23.69%
Odisha Mining Corporation
106.18
10.03%
60.00
5.67%
4.20
0.40%
1058.80
100%
01.03.2023
Rail Vikas Nigam Limited has following JVs/SPVs for other projects:
Details of Equity of RVNL's new SPVs/JVs (as on 31.03.2026)
Name of SPV
Date of
Paid upEquity
RVNL's Equity
Partners' Equity
Incorporation
Crore
%age
(D)
Shimla Bypass Kaithlighat Shakral Pvt. Ltd.
05.08.2022
130.10
65.05
Chatra Expressways Pvt. Ltd.
24.04.2023
3.01
1.47
49%
1.54
51%
Kinet Railway Solutions Limited
19.04.2023
411.00
102.75
25%
308.25
75%
JGPL-RVNL EPC Private Limited
15.01.2024
0.01
0.0049
0.0051
a) Shimla Bypass Kaithlighat Shakral Pvt. Ltd. (SBKSPL)
The Government of India had entrusted to the Authority (NHAI) the development, maintenance and management ofGreenfield alignment of National Highway No 5-including the section from km 128.835 to km 146.300 (approx. 17.465 km).The Authority had resolved to Construction of 4 Laning of NH-5 from Kaithlighat to Shakral Village for Design Length17.465km in the State of Himachal Pradesh by Four-Laning thereof on design, build, operate and transfer (the "DBOTAnnuity" or "Hybrid Annuity") basis, which shall be partly financed by the Concessionaire who shall recover its investmentand costs through payments to be made by the Authority.
The Consortium has been promoted and incorporated the Concessionaire as a limited liability company under theCompanies Act 2013 named Shimla Bypass Kaithlighat Shakral Pvt. Ltd. by Rail Vikas Nigam Ltd. and M/s S P SinglaConstructions Pvt. Ltd as its lead members for the execution of the project.
Brief of the Project:
Location and State
4-Lane Bypass, Package-I, Kaithlighat to Shakral, Shimla, Himachal Pradesh
Hybrid Annuity Mode & 17.465 km
15.05.2022
Project cost
• id Project Cost (BPC) - C1844.77 Crore excluding GST
• First Year O&M Bid - C2.77 Crore excluding GST
Adjusted Bid Price - C 1637.96 Crore (NPV of BPC and First Year O&M)
Equity Participants and their% share
S. Representative ofNominees' Name
No. company
No. ofShares
% of
Shareholding
1. M/s S P S Construction Mr. Sat Paul SinglaIndia Private Limited
(Formerly known as Mr. Deepak SinglaSP Singla ConstructionIndia Private Limited)
6,50,50,000
50
2. M/s Rail Vikas Nigam Mr. ChandanLimited (RVNL)- Kumar Verma
Mr. Rakesh Sabharwal
Anticipated CommercialOperations Date (COD)
After the end of Construction period tentatively 20.04.2026
b) Chatra Expressways Pvt. Ltd.
Chatra Expressways Private Limited (CEPL) is a Special Purpose Vehicle (SPV) formed as a joint venture between Rail VikasNigam Limited (RVNL) and its project partner for the development of a national highway project under the BharatmalaPariyojana on the Hybrid Annuity Mode (HAM). The company has been established to undertake the construction, operationand maintenance of the project in accordance with the concession agreement executed with the National Highways Authorityof India (NHAI). CEPL reflects RVNL's strategic expansion into the highway infrastructure sector and reinforces the Company'scommitment to developing multi-modal infrastructure through efficient project execution and long-term asset management.
Chandauli, Uttar Pradesh to Bangam, Kolkata
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Sonepurbighavillage to junction with NH-22 (Chatra Bypass) near Chatra from km 184.700 to km222.000 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid AnnuityMode (Package 8).
The length of the project is 37.300 Kms.
C 1271.99 Crores (Without GST)
Equity Participants and their
Tracks & Towers Infratech (P) Ltd.- 51%
% share
Rail Vikas Nigam Limited- 49%
Construction Period
730 days (24 months)
Scheduled Completion
730 Days from Appointed Date (Additional 90 Days)
RVNL, in collaboration with its consortium partners, hassigned the prestigious Manufacturing cum MaintenanceAgreement of Vande Bharat Trainsets includingupgradation of the Government Manufacturing Units &Trainset Depots. This project is being executed througha Special Purpose Vehicle (SPV) named Kinet RailwaySolutions Limited (KRSL), jointly owned by RVNL and itsconsortium partners namely JCS Meterowagonmash(MWM), JSC Locomotive Electronic Systems (LES), andRail Vikas Nigam Limited (RVNL). The shareholding of theKRSL as on Marrch 31,2026 is as follows due to changesin shareholding pattern of the company on the approvalof Indian Railway:
MWM
35%
LES
40%
Acting as the Technology Partner, KRSL is spear heading
the implementation of this visionary initiative.
Key highlights of this project include:
• KRSL has been entrusted with the manufacturingof 120 Vande Bharat Trainsets at the ManufacturingUnit located in Latur, Maharashtra.
• A planned maintenance regime has been devised,earmarking three designated depots - Bijwasan,Jodhpur, and Thanisandra - for the servicingand upkeep of these cutting-edge trainsets,ensuring their operational excellence for a periodspanning 35 years.
• Comprehensive infrastructural planning, includingthe provision of state-of-the-art facilities as wellas machinery, has been undertaken to equip the
designated depots, ensuring seamless operationsand maintenance activities.
• The project timeline entails the delivery of the firstprototype of the Vande Bharat Trainset to the IndianRailways by December 2026, followed by secondprototype by February 2027. Regular deliveriesfollow marking a significant milestone in thenation's pursuit of advanced railway infrastructure.
• The Production was started at its Latur factory inFebruary 2026.
• KRSL has received 2 internation design awards for itsVande Bharat Sleeper train design:
• The exterior design concept of the newVande Bharat Sleeper Train, developed byKRSL, has been recognized as a winner of theRed Dot Award: Design Concept 2026 in theTrains, Planes and Watercraft category. Thisprestigious international award is one of theworld's most influential honors in industrialand mobility design. The international jurypraised the project for its vision of combiningmodern design language trends withcultural depth.
• The Vande Bharat Sleeper First ACcompartment concept, developed by KRSL,has received the prestigious international2026 A' Design Award for its outstandingcontribution to mobility and transportationdesign. The international jury highly praisedthe project for its passenger-centric approach,thoughtful functionality, and refined visualidentity, granting it the Bronze A' DesignAward in the 2026 edition of the competition.
New Delhi, India
Project Type
"Manufacturing cum Maintenance of Vande Bharat Trainsets including upgradation ofthe Government Manufacturing Units & Trainset Depots"
- 200 Vande Bharat Train sets of Sleeper version, each of 16 cars.
- Supply and undertake comprehensive maintenance thereof for a period of 35 years.
The L1 selected bidder would have to manufacture/assemble total 120 Trainsets atRailway's Marathwada Rail Coach Factory (MRCF)/Latur.
The L2 selected bidder would have to manufacture/assemble total 80 Trainsets atRailway's ICF/Chennai.
14.11.2022
The total quantity is 120 Trainsets and cost per set is C120 Crores. (as per LOA)
RVNL- 25%
Joint Stock Company Metrowagonmash- 35%
Joint Stock Company Locomotive Electronic Systems- 40%
The RVNL has following wholly owned Subsidiary Companies in India and abroad:
1. HSRC Infra Services Limited
2. Masakani Paradeep Road Vikas Limited
3. Sabbavaram Sheelanagar Road Development Limited
4. RVNL Infra South Africa
5. RVNL Infra Middle East (Oman)
6. RVNL Middle East Contracting L.L.C. (Dubai)
7. Rail Vikas Nigam LLC (Uzbekistan)
8. Rail Vikas Nigam Ltd. Company (One Person) (Kingdom of Saudi Arabia)
d) JGPL-RVNL EPC PRIVATE LIMITED
JGPL-RVNL EPC Private Limited is a joint venture company formed by Rail Vikas Nigam Limited (RVNL) and Jakson GreenPrivate Limited to undertake engineering, procurement and construction (EPC) projects in the renewable energy sector. Thecompany has been established to execute large-scale grid-connected solar power projects integrated with Battery EnergyStorage Systems (BESS), supporting the transition towards sustainable and clean energy infrastructure. Through the combinedexpertise of RVNL in infrastructure development and Jakson Green in renewable energy solutions, the joint venture aims todeliver technologically advanced and reliable energy projects while contributing to India's and international clean energyinitiatives.
A 626, 6th Floor, DLF Tower A, Jasola, Sarita Vihar, South Delhi - 110076
Grid Connected Solar PV Project along with Battery Energy Storage System(250 MW - Solar and 63 MW BESS)
Approx. US$157.82 million (C 1,326 crore)
RVNL- 49%
Jakson Green Private Limited-51%
16 September 2025 (scheduled commissioning)
5. PERSONNEL DEVELOPMENT
Human Resources continued to remain a key strategicenabler for Rail Vikas Nigam Limited (RVNL) in achievingits business objectives during the year. The Company'sHR philosophy is centred on attracting, developing,motivating and retaining a highly competent workforcecapable of delivering complex infrastructure projectsacross the country. RVNL has consistently maintaineda lean yet professionally skilled workforce, supportedby progressive HR policies and a performance-orientedwork culture.
Considering the dynamic and project-based nature of itsoperations, RVNL adopts a balanced manpower strategycomprising experienced officers on deputation fromIndian Railways and other Government organizations,alongside a steadily expanding regular cadre.
RVNL continued to review and strengthen its employee-friendly policies aimed at improving employeeengagement, productivity and organizationaleffectiveness. The Company provides a conducive workenvironment supported by competitive compensation,welfare measures, transparent career progression policiesand performance-based recognition systems.
Continuous learning and capability building remainedan important focus area during the year. Employees atvarious levels were nominated for in-house, external andcustomized training programmes covering technical,managerial, financial, contractual, digital and behaviouralcompetencies. The training initiatives were designed toenhance professional capabilities, leadership skills andadaptability to emerging technologies and evolvingbusiness requirements, thereby enabling employees toeffectively contribute to the Company's expanding anddiversified portfolio of infrastructure projects.
RVNL continued its tradition of recognizing and rewardingexcellence through its Annual Day celebrations. IndividualAwards, Group Awards, Shields and Cash Awards werepresented to employees and project units demonstratingoutstanding performance, innovation, commitment andexcellence in project execution. Such recognition servesas an important motivational tool and reinforces theCompany's culture of meritocracy and high performance.
Employee welfare continued to receive high priorityduring the year. In line with the Government guidelinesand the Company's commitment towards employee well¬being, various welfare initiatives were organized. Medicalhealth check-up camps and awareness programmes wereorganized at different locations.
The International Women's Day was celebrated withactive participation of women employees across theorganization.
RVNL continued its long-term strategy of building astrong in-house cadre while maintaining the operationalflexibility required for execution of project-basedassignments. The Company has progressively enhancedthe strength of its regular workforce through absorptionand direct recruitment, thereby reducing reliance ondeputation in a calibrated manner without compromisingproject execution capabilities. This balanced manpowerstrategy will continue to support RVNL's growth trajectoryand expanding business portfolio in the years ahead.
The RVNL Conduct and Discipline Rules are in line withthe requirements of the Sexual Harassment of Womenat the Workplace (Prevention, Prohibition & Redressal)Act, 2013. An Internal Complaints Committee has beenset up in RVNL to redress complaints received regardingsexual harassment. All employees are covered under thispolicy. The following is a summary of sexual harassmentcomplaints received and disposed off during thefinancial year: -
i) No. of complaints received: Nil
ii) No. of complaints disposed of: NA
The Company diligently complies with the provisions ofthe Right to Information Act, ensuring timely responsesto all requests received. Appellate Authority, ChiefPublic Information Officer (CPIO), and Assistant Public
Information Officers (APIOs) have been designated atthe Corporate Office, with APIOs also nominated at eachPIU. During FY 2025-26, a total of 264 RTI applicationswere received, of which 250 were disposed of. Sevenapplications remained under process, while initial actionon seven applications was pending at the close of thefinancial year.
The company has been making concerted efforts toimplement the directives of the Government of Indiaon use of Rajbhasha (Official Language). The RajbhashaDepartment of the Company has a Part-time MukhyaRajbhasha Adhikari and Sr. DGM (Rajbhasha) cum Up-Mukhya Rajbhasha Adhikari. All the computers in theCorporate Office have been provided with Unicodecompliant software and fonts to facilitate access tocommon templates in Devnagari. To encourage use ofRajbhasha, total 12 officials who use Rajbhasha in Hindidrafting notes and letters were identified from all thedepartments and given Late Shankar Dayal Singh SmritiPuraskar amounting to C4,000/- each. A competitionon Hindi essay writing, Hindi noting and drafting, HindiShabd Gyan and Quiz was organized on the occasionof Hindi Pakhwara in the month of September, 2025.Cash awards of C 1,02,300/- were distributed to 38successful participants. The Company has also set upa reading room-cum-library room in the CorporateOffice with a good collection of books, newspapers andperiodicals in Hindi. During 2025-26, 4 meetings of theRajbhasha Implementation Committee of RVNL wereheld and promotion of Rajbhasha was discussed andreviewed. During Financial Year 2025-26, ParliamentaryCommittee (On Official Language) carried out inspectionof RVNL's Corporate Office and Committee has expressedsatisfaction. During Financial Year 2025-26, Nagar OfficialLanguage Implementation Committee, Upkram-2 hasprovided Rajbhasha Shield to RVNL for organizing HindiChitra Varnan Pratiyogita for member offices of NagarOLIC Upkram-2.
During the year 2025-26, no presidential directive wasreceived by the Company .
6. Vigilance
The Vigilance Department of RVNL, headed by the ChiefVigilance Officer (CVO), works mainly on a preventiveapproach to strengthen transparency, accountability,and proper work procedures. Along with investigatingcomplaints from various sources, it also conductspreventive inspections and checks. The findings fromthese activities are shared with management to enablecorrective actions and system improvements, and follow¬up is done to ensure compliance.
During FY 2025-26, the department focused on clearingpending cases related to the Central Vigilance Commission(CVC) and Chief Technical Examiner Organisation (CTE)by actively coordinating with field units for responsesand action taken reports. It also supported one intensiveCTE/CVC examination of a work in PIU Chandigarh andresponded to observations from earlier inspections.
In total, five CTE-type examinations and two preventivechecks were conducted during the year. The departmentalso carried out broader preventive vigilance activities,including surprise inspections, file scrutiny, review ofproperty returns, and examination of audit reports.
The complaints received by Vigilance from time to timewere dealt with as per procedure prescribed by CVC &DoPT. During the FY 2025-26, out of (80) complaints (otherthan PIDPI), 77 complaints were promptly disposed (Filed/Sent for NA/Registered for Investigation).
Sl. Penalty
Remarks
No. Minor Major
01 02 00
Two officials on deputationto RVNL, Minor penaltyCases processed by RVNLVigilance
During FY 2025-26 approx. 475 Employees vigilance wereprocessed by RVNL Vigilance as required by HR/RVNL,Railway Board Vigilance, Zonal railways Vigilance etc. AllVigilance status/clearance cases were processed throughe-office for prompt disposal.
Two preventive check conducted on"procurement of heavyduty commercial networks printers" and "procurement ofAntivirus Software "at corporate office RVNL.
Based upon the investigation and inspection of vigilance anamount of rupees C28,331,430/- has been recommendedfor recovery.
In a move to promote the true spirit of participativevigilance, the Central Vigilance Commission (CVC) issuedinstructions for a three-month campaign period from 18thAugust 2025 to 17th November 2025. As per the CVC'sguidance, the following preventive vigilance areas wereidentified as focus points for all Ministries, Departments,and Organizations:
Disposal of pending complaintsDisposal of pending casesCapacity building programmesAsset managementDigital initiatives
In addition to the above, Rail Vikas Nigam Limited (RVNL)conducted several training and awareness programmesduring the campaign period on key themes, including:
Cyber Security and HygienePublic ProcurementPreventive VigilanceConduct Rules
Ethics, integrity, and attitudinal change"Vigilance - Our Shared Responsibility"Transparency and vigilance in public works
Further, during Vigilance Awareness Week (VAW) 2025,the following activities were also undertaken:
1. Administration of the Integrity Pledge
2. Quiz competitions
3. Nukkad Natak (street plays)
4. Online slogan competitions
5. Webinar on Public Interest Disclosure and Protectionof Informers (PIDPI) training programme
. Memorandum of Understanding
The Company secured a rating of "Very Good" byDepartment of Public Enterprises for the year 2024-25 onthe basis of the achievement of the committed targetsfixed in the Memorandum of Understanding signedbetween RVNL and Ministry of Railways.
During FY 2025-26, MoU includes some of the compliance parameters/Main parameters and their compliance status areas follows:
Compliance Parameter
Status of compliance
DPE Guidelines on CSR Expenditure
Complied
Provision in the Companies Act, 2013 (or SEBI (LODR) regulations in case of listedentities) on Corporate Governance:
a. Compositions of board of Directors
b. Board Committees
c. Holding Board and Committees' Meetings
d. Related Party Transactions
e. Disclosures and Transparency
(to the extent the complianceare within the ambit of RVNL.)
Onboarding of CPSE on all operational TReDS platforms
Timely payments to MSE vendors as prescribed in MSMED Act
Procurement of goods and services (as % of total procuremnet), from:
a. MSE overall- 25%
b. SC/ST owned MSEs- 4%
c. Women owned MSEs- 3%
Steps and initiative taken for Health and Safety improvement of HumanResourses in CPSEs
Targets under PM Internship scheme of MCA
Not Applicable
Leadership Development Plan
Surplus non-core assets (land & building) monetization plan)
Company has not receivedany target for the financialyear 2025-26.
The details of DPE MOU 2025-26 target parameter vs achievement alongwith compliance with the DPE OM No. M-03/0006/2024-DPE (MoU) dated 24.03.2026 prescribing mandatory disclosures in the Annual Report of Central Public Sector Enterprises(CPSEs), has been given at Annexure-I.
8.2 Foreign Exchange Earnings and Outgo
The Foreign Exchange outgo during the year in terms of actual outflows as compared to previous year is mentioned below:
9. Risk Management
Your Company has a comprehensive Enterprise Risk Management (ERM) framework in place to proactively identify, assess,and mitigate potential risks. In line with the requirements of the Companies Act, 2013 and SEBI (LODR) Regulations 2015, theBoard has constituted a Sub-Committee known as the Risk Management Committee (RMC), which is chaired by the Director(Projects). During FY25-26, the RMC identified following as top risks for the Company:
Import of Material
364.81
Import of Capital Goods
Foreign Exchange on foreign travel of Company's officials
1.09
1.32
Import of Service
3.56
3.55
Rent
0.21
Purchase of tender
0.04
369.67
4.91
8. Particulars relating to Conservation of Energy,Technology Absorption and Foreign ExchangeEarnings and Outgo etc.
Rail Vikas Nigam Limited is committed to sustainabledevelopment through energy efficiency, resourceconservation, and environmental protection bypromoting renewable energy such as solar installations,energy-efficient LED lighting, and sensor-based systemsto reduce power consumption and carbon footprint;implementing water conservation measures includingrainwater harvesting, tunnel water utilization, and effluenttreatment and reuse; adopting net-zero waste practicesand circular economy principles through recycling andeco-friendly infrastructure; undertaking afforestation andecological restoration through plantation of native species,slope stabilization via turfing, and wildlife conservation tosupport biodiversity; integrating green building initiatives
through energy-efficient design, sustainable materials,and environmentally conscious planning; supportingcommunity development through livelihood and skillenhancement and local infrastructure improvement; andfollowing sustainable construction practices to minimizeenvironmental impact through efficient resource useand pollution control. Across its projects and offices, thecompany regularly monitors electricity consumption toimprove operational efficiency, with diesel usage largelyrestricted to emergency backup power requirements,while water consumption and wastewater discharge aresystematically tracked to promote responsible use. It alsoimplements environmentally sound waste managementpractices, including waste segregation at source anddisposal of plastic and e-waste through authorizedrecyclers in compliance with environmental regulations,reflecting its continued commitment to sustainableinfrastructure development, regulatory compliance,resource efficiency, and circular economy principles.
1. Compliance & Legal Risks
2. Social Risks
3. Financial Risks
4. Cyber Risks
5. Project related Risks
6. Operational & Safety Risks
The RMC meets regularly and monitors the top risksthrough reporting of key risk indicators, preparemitigation plans and monitors their implementation.The risk assessment and the progress of the mitigationmeasures are reported regularly to the Board of Directors.
10. Corporate Social Responsibility (CSR)
The Company's Corporate Social Responsibility (CSR)Policy is guided by the objective of creating sustainableand inclusive social impact through focused interventions.The key principles of the Policy are as follows:
a) Undertaking CSR initiatives through a project/programme-based approach to ensure effectiveimplementation and measurable outcomes.
b) Giving priority to the peripheral areas of RVNL'sprojects, while also addressing the needs of otherdeserving areas, wherever considered appropriate.
c) Focusing on high-impact sectors such as educationand healthcare to promote sustainable communitydevelopment.
d) Contributing to inclusive socio-economicdevelopment with special emphasis on the welfareand empowerment of economically and sociallyweaker sections of society, including communitiesresiding in aspirational and backward districts ofthe country.
In compliance with the provisions of Section 135 of theCompanies Act, 2013, read with the Companies (CorporateSocial Responsibility Policy) Rules, 2014, as amended, andthe applicable guidelines issued by the Department ofPublic Enterprises (DPE), the Company has constituteda Corporate Social Responsibility (CSR) Committee. Thedetails relating to the composition of the CSR Committee,the salient features of the CSR Policy, and the CSR initiativesundertaken by the Company during the Financial Year2025-26 are provided in **Annexure C**, forming part ofthis Report.
11. Compliance of provisions of Companies Act,2013, SEBI (LODR) Regulations, 2015 andSecretarial Standards issued by ICSI
All the provisions of the Companies Act, 2013 and theRules made thereunder, Secretarial Standards issuedby ICSI and SEBI (LODR) Regulations, 2015 to the extentpossible and applicable to the Company as well as allrelevant notifications thereon issued by the Governmentof India, are being strictly complied with.
12. Compliance of DPE Guidelines and Policies
All the guidelines and policies including guidelines havingfinancial implications issued by Department of PublicEnterprises from time to time are duly complied with bythe Company.
13. Compliance of the Public Procurement Policy forMicro and Small Enterprises (MSEs) Order, 2012
The Government of India has notified Public Procurementpolicy for Micro and Small Enterprises (MSEs) Order,2012 with effect from 1st April, 2012. As the mandateof the Public Procurement Policy for Micro and SmallEnterprises (MSEs) Order 2012, every Central Ministries/CPSUs is required to set an annual target of minimum 25%procurement of goods & services from MSE Sector. Out ofTotal annual procurement, a sub target of 4% & 3% shouldbe from MSEs owned by SC/ST and Women entrepreneursrespectively.
Rail Vikas Nigam Limited (RVNL) has taken several stepsfor effective implementation of MSE Policy. The benefits ofwaiver of cost of tender documents and deposit of earnestmoney, prescribed under the policy, are incorporatedin the tenders for stores procurement and obtainingservices etc.
Shri Ravindra Kumar, ED/HR is working as Nodal as wellas the Grievance Officer for seamless implementation ofthe MSE policy in RVNL. Contact details of said officer isuploaded on RVNL website.
Annual Procurement Plan for purchase from MSEs duringthe year 2025-26 was made available on RVNL websitefor information of MSEs and to help them participate inprocurement of goods and services.
In the year 2025-26, RVNL procured goods and servicesamounting to a total of C59.17 crores. Out of this, thetotal value of goods and services purchased fromMSEs (Including MSEs owned by SC/ST and Womenentrepreneurs) was to the tune C 17.51 crores i.e. 29.59%of the total procurement. Thus, RVNL has fully compliedwith the Public Procurement Policy for Micro and SmallEnterprises (MSEs) Order, 2012.
As desired, the expenditure incurred by RVNL on under mentioned head of accounts for the period from 01.04.2025 to31.03.2026 is given below:
GL Name
Details of MSME upto 31.03.2026 FY 2025-26 EIn crore
MSME MSE/SC-
Total ST Tgt 4%
Provisional MSE/ MSE/ MSME of totalGL Code Expenditure MSE SC-ST Women provisional
expenditure
MSE/
Women Tgt3% of totalprovisionalexpenditure
Total MSETgt 25%of totalprovisionalexpenditure
Vehicle hiring
5206050004
5.80
1.38
2.32
3.70
40.10%
0.00%
63.85%
Photocopy Exp./Printing& stationary
5206110002/
5206110003
0.25
0.08
0.24
0.58
4.43%
12.81%
30.54%
Outsourcing Staff
5206120003
20.46
2.45
2.46
0.05%
12.01%
House Keeping /SecurityService
5206170003/
5206170004
15.29
5.32
0.09
2.49
7.91
0.61%
16.29%
51.71%
Office Equipments
1101010001
1.16
0.05
0.06
0.53%
5.08%
Furniture and Fixtures
1101020001
3.24
0.00
0.26%
0.39%
EDP Assets
1101030001
2.30
0.12
1.65%
5.24%
Total (A)
50.15
9.54
2.51
2.79
14.84
5.00%
5.56%
29.59%
GST calculate on total(A) @18% (Provisional)
9.03
1.72
0.45
0.50
2.67
Total (A) (including GST)
59.17
11.26
2.96
3.29
17.51
d) The Directors have prepared the annual accountson a going concern basis.
e) The Directors have laid down internal financialcontrols to be followed by the Company and thatsuch internal financial controls are adequate andwere operating effectively.
f) The Directors have devised proper systems to ensurecompliance with the provisions of all applicablelaws and that such systems were adequate andoperating effectively.
16. Directors and Key Managerial Personnel
RVNL being a Government Company, the appointmentof directors on its Board are done by the Govt. of Indiathrough Administrative Ministry i.e. Ministry of Railways,from time to time.
As on date of this report, the strength of the Board of theCompany comprises of Eight (8) Directors, out of whichFive (5) are whole-time Directors (including Chairman
and Managing Director), Two (2) Government NomineeDirector from Administrative Ministry i.e., Ministry ofRailways (MoR) as (Part-time) (official) Directors and One(1) Independent Director as (Part-time) (non-official)Director. Position of six (6) Independent Directors(including one-woman Independent Director) is vacant.However, the composition of the Board of Directors wasnot in conformity with the provisions of the CompaniesAct, 2013, SEBI (LODR) Regulations,2015 and DPEGuidelines on Corporate Governance, due to absence ofrequisite number of Independent Directors including oneWoman Independent Director on its Board.
The Company has been requesting Ministry of Railways(MoR), Government of India to appoint requisite numberof Independent directors (including woman IndependentDirector) to ensure the compliance to the provisions ofSEBI (LODR) Regulations, 2015 and DPE Guidelines onCorporate Governance. Except the appointment ofIndependent Directors (including woman IndependentDirector), the composition of the Board is in compliancewith Regulation 17 of SEBI (LODR) Regulations, 2015.
14. Research and Development
Implementation of an Integrated IT Solution for RVNL
RVNL is utilizing a number of IT initiatives to automatethe business processes of the organization acrossemployee services, office procedures, projectmanagement, and vendor bill processing. Among thelatest systems implemented, the following are noteworthyaccomplishments:
• RVNL is embarking on the adoption of Data Analyticsand Artificial Intelligence (AI) technologies, makingits processes more centralized, digitized, andautomated.
• RVNL upgraded its Data Centre infrastructure andmigrated it to RailTel. With this, the Company'ssystems are now running on modern and upgradedhardware, resulting in improved performance,reliability, and scalability.
• RVNL continues to enhance its digital ecosystemthrough the implementation of various IT solutions forimproved efficiency, transparency, and governance.
RVNL, being a Navratna Public Sector Enterprise, ensurescompliance with the provisions of the InformationTechnology Act, 2000, and has always remained at theforefront of adopting new technology solutions for thecontinual improvement of its business processes. With avision to become a digitally empowered organization foroperational excellence and stakeholder value creation, theCompany has adopted several innovative technologies inits technology stack.
Various IT projects that are in the pipeline for
implementation include:
• Upgradation of SAP systems from ECC 6.0 toSAP S/4HANA.
• Upgradation of the e-Office platform to enhancedigital file management and office automation.
• Revamping of the RVNL Corporate Websiteto improve user experience, accessibility, andstakeholder engagement.
15. Directors' Responsibility Statement
Pursuant to Section 134(5) of the Companies Act,
2013, the Directors confirm that -
a) In the preparation of the annual accounts, theapplicable accounting standards have beenfollowed along with proper explanation relating tomaterial departures;
b) The Directors have selected such accountingpolicies and applied them consistently and madejudgments and estimates that are reasonable andprudent so as to give a true and fair view of thestate of affairs of the Company at the end of thefinancial year and of the profit of the Company forthat period;
c) The Directors have taken proper and sufficientcare for the maintenance of adequate accountingrecords in accordance with the provisions of thisAct for safeguarding the assets of the Companyand for preventing and detecting fraud and otherirregularities;
The following Directors held office during the year and till the date of this report-
Name & DIN of Directors
Designation
Date of Appointment/ Cessation
Whole Time Directors/Functional Directors
Mr. Saleem Ahmad
(DIN: 10119432)
Chairman and Managing Director
From 23.12.2025 onwards
Mr. Sukhmal Chand Jain
(DIN: 07564584)
From 01.09.2025 upto 23.12.2025
Mr. Pradeep Gaur
(DIN: 07243986)
From 01.09.2018 upto 31.08.2025
Mrs. Anupam Ban
(DIN: 07797026)
Director (Personnel)
From 09.02.2023 onwards
Mr. Mritunjay Pratap Singh
(DIN: 08165734)
Director (Operations)
From 26.11.2024 onwards
Mr. Abhishek Kumar
(DIN: 10644411)
Director (Finance)
From 05.06.2025 onwards
Mr. Sanjeeb Kumar
(DIN: 03383641)
Director (Finance) & CFO
from 06.05.2020 upto 31.05.2025
Mr. Amit Tandon
(DIN: 10167354)
Director (Projects)
From 02.01.2026 onwards
Mr. Sandeep Jain
(DIN: 09435375)
From 25.11.2024 upto 07.08.2025
Government Nominee Directors/Part time Official Directors
Mr. Bhartesh Kumar Jain
(DIN: 11508692)
Govt. Nominee Director
From 28.01.2026 onwards
Mr. Naresh Chandra Karmali
(DIN: 09103211)
From 20.05.2024 onwards
Mr. Prem Sagar Gupta
(DIN: 09329458)
From 06.11.2024 upto 05.01.2026
Independent Directors/ Part time Non-Official Directors
Mr. Surender Singh
(DIN: 11108145)
Independent Director
From 15.05.2025 onwards
*The Company has received declarations from the Independent Directors confirming that they meet the criteria of independence asprescribed under the Companies Act, 2013 and SEBI (LODR) Regulations, 2015 as amended from time to time.
Name
Date ofchange
Reasons
02.01.2026
Appointment as an Additional Director
Chairman & Managing Director& Chief Executive Officer
23.12.2025
Appointment as an Additional Director &Chief Executive Officer
Chairman & Managing Director
01.09.2025
Cessation of office as an AdditionalDirector
Cessation of Office due to retirement
07.08.2025
Cessation of Office
28.08.2025
05.06.2025
Change in designation from AdditionalDirector to Whole-time Director
01.06.2025
15.05.2025
Change in designation from AdditionalDirector to Independent Director
Mr. Chandan Kumar Verma
(DIN: 10298031)
ED (Finance) & Chief FinancialOfficer
02.07.2025
Appointment as a Chief Financial Officer
In terms of the provisions of Section 149 of the CompaniesAct, 2013 read with the Companies (Appointment andQualification of Directors) Rules, 2014, a Company shallhave at least one-Woman Director on the Board of theCompany. Further, as per SEBI (LODR) (Amendment)Regulations, 2018, a Company shall have at least oneIndependent Women Director. Your Company hadno Independent Woman Director on the Board ofthe Company since 18.09.2020. The Company hasrequested Ministry of Railways for appointment ofWomen Independent Directors in order to comply withthe requirements under Regulation 17 of SEBI (LODR)Regulations 2015 and Companies Act, 2013.
Annual evaluation by the Board of its ownperformance and that of its Committees andIndividual Directors-
RVNL being a Government Company is exempted videnotification No. F.No.1/2/2014-CL. V dated 5.6.2015issued by Ministry of Corporate Affairs, to comply withthe provisions of Sec 134(3)(e) and Sec 134(3)(p) withrespect to Annual evaluation by the Board of its ownperformance and that of its Committees and IndividualDirectors. Ministry of Corporate Affairs (MCA) vide GeneralCircular dated 5th June, 2015 has exempted GovernmentCompanies from the provisions of Section 178(2) whichrequires performance evaluation of every director by theNomination & Remuneration Committee. In case of RVNL,the performance evaluation of Directors is done by theMinistry of Railways as per their laid down procedure.
The Board of Directors of the Company has designated allthe Whole-time Directors, Chief Executive Officer (CEO),Chief Financial Officer (CFO) and Company Secretary asthe Key Managerial Personnel (KMP) of the Company;and Chairman & Managing Director (CMD) and ExecutiveDirector (Finance) have been designated as CEO and CFO,respectively.
Changes (Appointment/Cessation) in Key ManagementPersonnel's (KMP) during the year and till the date of thisreport is mentioned in Report on Corporate Governance.
Further, DPE, through our Administrative Ministry (MOR)has started the exercise of performance evaluation/assessment of non-official (Independent) Directors on theBoard of the Company.
Retirement of Directors by Rotation
The Companies Act, 2013 provides that the provisionsin respect of retirement of Directors by rotation will notbe applicable to Independent Directors. In view of this,no Independent Director is considered to be retiring byrotation; However, all other directors are considered tobe retiring by rotation. Accordingly, as per provisions ofsection 152 of Companies Act, 2013, one third among allother directors namely Smt Anupam Ban, (DIN: 07797026),Director (Personnel) and Shri M.P. Singh, (DIN:08165734), Director (Operations) being longest inoffice, are liable to retire by rotation and beingeligible, offer himself for re-appointment. The detailsof Director seeking re-appointment
at the ensuing AGM are contained in the Noticeconvening the ensuing AGM of the Company.
Meetings of the Board of Directors and OtherCommittees of the Board and their Composition
Pursuant to the Companies Act, 2013 and Rules framedthere under, seven (7) Board Meetings were held in the F.Y.2025-26. The details of the Meetings are in the CorporateGovernance Report forming part of this report. YourCompany has Audit Committee, CSR Committee, andother Committees of the Board in place in compliance toCompanies Act, 2013 and SEBI (LODR) Regulations. TheComposition and scope of the Committees are providedin the report of Corporate Governance, forming part ofthis report in Annexure-B. Further, there has been noinstance where the Board of Directors have not acceptedthe recommendation of Audit Committee.
A Statement regarding Opinion of the Board withregard to Integrity, Expertise and Experience(including the Proficiency) of the IndependentDirectors appointed during the year
The Independent directors appointed on the Board ofthe Company are eminent personalities drawn fromfields like Science, Finance, management, i ndustry etc.having wide experience. Upon induction on the Board ofthe Company, the Independent directors are familiarizedwith profile of the Company, its business, industryscenario, operations, organizational structure, statutory& regulatory responsibilities through familiarizationprogramme. During the Financial year 2025-26, noIndependent Director on the board of Rail Vikas NigamLimited (RVNL) has resigned from the post of IndependentDirector. However, the present Independent Director haswide experience in his field and has contributed towardsthe growth of the Company. In the opinion of the Board,the Independent Director fulfils the conditions specifiedin the Listing Regulations and are independent of themanagement.
However, the composition of the Board of Directors wasnot in conformity with the provisions of the CompaniesAct, 2013, SEBI LODR Regulations and DPE Guidelineson Corporate Governance, due to absence of requisitenumber of Independent Directors including WomanIndependent Director on its Board. The Company hasbeen requesting Ministry of Railways (MoR), Governmentof India to appoint requisite number of Independentdirectors (including woman Independent Director) toensure the compliance to the provisions of SEBI (LODR)Regulations, 2015 and DPE Guidelines on CorporateGovernance. Except the appointment of IndependentDirectors (including woman Independent Director), thecomposition of the Board is in compliance with Regulation17 of SEBI (LODR) Regulations, 2015.
17. AuditorsStatutory Auditor
The Comptroller & Auditor General of India has appointedM/s., Gandhi Minocha & Co., Chartered Accountants asStatutory Auditors of the Company for the year ended31st March, 2026. The Board would like to thank them fortheir valuable support and guidance during the audit ofaccounts under review.
The Board of Directors has appointed M/s Sinha &Srivastava LLP, Practicing Company Secretary toconduct the Secretarial Audit for a priod of 5 yearsstarting from financial year 2025-26. The SecretarialAudit Report is annexed and forms part of this AnnualReport in Annexure E.
18. Reporting of Frauds by Auditors
During the year, neither the Statutory Auditor nor theSecretarial Auditor have reported to the Audit Committeeunder Section 143(2) of the Companies Act, 2013, anyinstance of fraud committed against the Company by itsofficers or employees.
19. Comments of Comptroller & Auditor General(C&AG) of India
The Comptroller & Auditor General of India has undertakensupplementary audit on the accounts of the Company forthe year ended 31st March, 2026 under Section 139(5) ofthe Companies Act, 2013. The comments of the C&AG onthe Annual Accounts of the Company for the year ended31st March, 2026 along with management reply, if any, willforms part of this report as and when received.
20. Details of Significant and Material Orderspassed by the Regulators or Courts or Tribunalsimpacting the Going Concern Status andCompany's Operations in Future.
No Significant and Material Orders Passed by TheRegulators or Courts or Tribunals impacting the GoingConcern Status and Company's Operations in Futureduring the year under Review
21. Particulars of Employees and Related Disclosures
The provisions of Section 134(3) (e) of the CompaniesAct, 2013 are not applicable to a Government Company.Similarly, Section 197 of the Companies Act, 2013 shall notapply to a Government Company. Consequently, there is norequirement of disclosure of the ratio of the remunerationof each Director to the median employee's remunerationand other such details, including the statement showingthe names and other particulars of every employee ofthe Company, who, if employed throughout/part of thefinancial year, was in receipt of remuneration in excess ofthe limits set out in the Rules.
22. Material Changes and Commitments affectingFinancial position between the end of theFinancial Year and Date of Report
There are no material changes and commitments affectingfinancial position of the Company which occurredbetween 01.04.2025 to 31.03.2026 and date of signing ofthis Report .
23. Cost Records
The Board of Directors has appointed M/s R M Bansal & Co.to conduct the Cost Audit for financial year 2025-26.
24. Difference in amount of the Valuation
There was no such instance of either settlement orloan from Bank or Financial Institution during the yearunder review.
25. General
Your Directors state that no disclosure or reporting isrequired in respect of the following matters as therewere no transactions on these matters during the yearunder review:
• Details relating to deposits covered under Chapter Vof the Companies Act 2013.
• Issue of equity shares with differential rights as todividend, voting or otherwise.
• There has been no change in the nature of businessof the Company.
26. Corporate Insolvency Resolution Processinitiated under the Insolvency and BankruptcyCode, 2016
The Company has no information to disclose under above.
27. Failure to implement any Corporate Action
The Company has implemented all Corporate Actionssuccessfully within prescribed timelines. Therefore, theCompany has nothing to report.
28. Acknowledgements
Your Directors also take this opportunity to gratefullyacknowledge the co-operation, guidance, and support ineffective management of company's affairs and resourcesprovided by Government of India, in particular Ministry ofRailways (MoR), Ministry of Finance, Department of PublicEnterprises, various banks, Asian Development Bank, theZonal Railways, IRFC and our equity partners in JointVenture SPVs for their continued interest and support tothe Company. Your Directors would like to express theirthanks for the devotion, commitment and dedicationof each and every employee of the Company due towhich your Company could face the new challengesand opportunities and create a niche for itself as a majorprovider of rail infrastructure in the country. Your Directorsalso acknowledge the support and guidance receivedfrom officials of Comptroller & Auditor General of India,Statutory Auditors, and Secretarial Auditors for theirsuggestions. Last but not the least, the Directors wouldlike to express their deep appreciation and gratitudetowards all their predecessors who have been associatedwith RVNL, for their valuable contribution to the growthand development of the Company in attainment of theCompany's aim and goals in all the spheres.
For and on behalf of Board of Directors
Place: New Delhi
Date: 25.07.2026 Sd/-
(Saleem Ahmad)
Chairman & Managing DirectorDIN: 10119432